I'm trying to put a tolerance of +.000 - .001 on a hole diameter, but when I fill out the Precision and tolerance form in edit hole notes it keeps coming up as +.000 +.001.
Does anyone know how to fix this?
I've attached the drawing.
Solved! Go to Solution.
Solved by mcgyvr. Go to Solution.
Is tolerance method "deviation"
and is there a + next to the upper box and a - next to the Lower box?
I'd guess that there is a + next to both boxes.. If so simply click on the + next to lower and it will change to a -
oh wait.. you said hole note.. Little different dialog..
You need to put -.001 in the lower box not .001
My guess is that you are entering --.001 (the first minus by Inventor). In mathematics a -- is +.
The CADWhisperer YouTube Channel
@Anonymous wrote:
My guess is that you are entering --.001 (the first minus by Inventor). In mathematics a -- is +.
He is just entering .001 but needs to enter -.001 in the lower.
One might "assume" that lower would automatically be a negative number and you don't have to enter the negative sign..but you do.
I guess it makes sense that it is required to put a "-" in there so you can add a tolerance of +.001 +.006 or something like that.
Thanks for the help!
@mnielsen55 wrote:
I guess it makes sense that it is required to put a "-" in there so you can add a tolerance of +.001 +.006 or something like that.
Thanks for the help!