1 Kudo
BiggePLM

Filter BOM View

Status: New Idea
by Valued Contributor BiggePLM on ‎07-25-2014 11:55 AM

To aide breaking down of a BOM View into lists for different purposes the custom BOM view is great. But when you have multiple functional areas looking at that information such as Procurement, Fabrication, Wharehouse etc. it would be nice to be able to filter the list to show only items in the BOM that met a specific criteria. Similar to the way Excell uses it Autofilter.

 

The idea would be that you have a filter row you could pick or enter the filter than apply and the currently displayed view would get filtered to show only matching items (parent items could be included if that causes issues). This functionality would be used for both Nested and Flat BOM Views.

 

BD

2 Kudos
BiggePLM

BOM Views for Flat BOM

Status: New Idea
by Valued Contributor BiggePLM on ‎07-25-2014 11:51 AM

It would be a time saver to be able to configure a custom BOM view for the Flat view, Similar to the nested view. This could possibly be implemented with a checkbox for and Applies to Nested, Flat or Both.

 

We have set up custom BOM field that is used to trigger spawing of tasks to perform action on the item in the BOM Row, I.E. Generate an RFQ request where the item info is copied via script to the RFQ Record. The issue is that in the nested view the quantity shown is the unit quantity not the project rolled up quantity. To get that you need to switch to the flat view get the rolled up quantity and switch back to the nested view and enter the quantity to Request for Quote.

 

This is just one use case, but feel that functionality would make the BOM View for useful.

 

BD

5 Kudos

Is there a chance that the same ability to move multiple dates out at the same time that is found in the milestones tab, can be replicated in the Project Management tab? With the complex way we are using PLM360 to support project management we cannot utilize the milestones tab.

 

That said we really like the ability to move multiple task dates out without having to change them one by one.

 

Is this possible?

 

Thanks!

 

Dan Naugle

0 Kudos

It would be helpful to be able to see the status of an item when editing in the project management tab.

 

Thank you!

Status: Comments Requested

Hi dnaugle,

 

We appreciate you submitting this idea request.  

 

Can you please clarify and provide more details?

Can you also provide use case?

 

We want to understand a little bit more about this request.

 

thank you,

 

Trung

10 Kudos
dkeeley

Project Management Improvements

Status: Accepted
by Mentor on ‎04-10-2014 03:26 PM

Hi,

 

I feel there is a need for significant improvements to the project management tab. I have been using it for a while and I have a number of issues. Many of them have bee reported here already (e.g. ability to add columns). However there are some fundamental changes required to make this tab useful for managing anything other than simple projects. Some other issues are;

 

- it is essential that reports can be run on projects

- milestone dates must be able to be changed and modified through the project UI (regardless of whether they are linked tasks or not)

- milestones and milestone status should be visible in the gantt chart

- Selectable colours

- etc etc etc

 

I'm a huge advocate of PLM 360 but currently the PM tab is letting it down. I've used another web based project management system before that I think you guys should have a look at. Please PM me for the URL if you're interested.

 

Regards,

 

David.

Status: Accepted
Hi David, We appreciate you taking the time to submit this idea to us. We will add to our feature list. Thank you, Trung
3 Kudos

PLM360 is proving to be a great tool for us in support of new idea mangement, project selection and project management. But one other piece could make all the difference...

 

A communication tool. Something where we could share quick notes or a chat with teammates in a project community. Perhaps being able to "watch" an item for new comments, specific conversations regarding that item that are happing everyday on some level. The daily notifications are helpful but a section of the homepage or a seperate window that could be kept open that displays "live" data would be fantastic.

 

The goal, replace all project specific communication now taking place in e-mail. Facilitate and store this communication within an item and display all "watched" item communications on my homepge / dashboard.

 

Thanks

Status: Comments Requested
Hi dnaugle, We appreciate your ideas and inputs. We will add this to our feature list. Thank you, Trung
0 Kudos
dnaugle

PLM360: Grouping Tasks in a Schedule

Status: Accepted
by dnaugle on ‎11-06-2013 01:01 PM

When you roll up individual tasks under a workspace record, and then link that record to a project schedule, you get a high level group with the tasks listed beneith it. This group can then be collapsed to make the Gantt chart much cleaner.

 

It would be helpful when adding "manual" (non-linked) tasks if there was a way to group these tasks so that they to can be closed and opened visually.

Status: Accepted
1 Kudo

I would love the ability to filter linked tasks on the project management tab so I don't have to look at tasks that are already completed, especially when they still show as red if they finished late.  

 

Another nice feature would be removing linked tasks from the project via script once the linked task transitions to a completed state.

Status: Implemented
4 Kudos

There should be a way to additionally sort the project management schedule. First the start date and then have the option to add another field like the Task Number.

Status: Future Consideration
After reviewing the request, we will add this to our future enhancement list thanks, Trung
1 Kudo
adminplm360

Pivot value update

Status: Comments Requested
by Active Contributor adminplm360 on ‎06-18-2013 08:21 AM

If I change the pivot value in Work Space A is not updated in Work Space B until I actually change the derived field  into another value. The derived field will change but the pivot wont.

 

I would like that the pivot value updates as the derived value does

 

Attached is how is happening right now.

 

 

Status: Comments Requested
This is part of the feature spec for derived fields, that is to provide options on how changes propagate. The currently functionality is defined that updates are only performed on explicit update/edit by the user. There are plans to add additional functionality to allow updates to propagate without user action. I'll add this idea Station request to our feature requirements to make sure this behavior is covered correctly.
You are not logged in.

Log into access your profile, ask and answer questions, share ideas and more. Haven't signed up yet? Register

Announcements
IdeaStation Guidelines
Review guidelines and best practices
before posting a new idea


PLM 360 Survey