New Idea
2 Kudos
matt.kelsay

Picklist Based on Group

Status: New Idea
by matt.kelsay on ‎07-21-2014 06:34 AM

Hello,

 

It would be very helpful to have picklists for Groups that are created that is similar to the Users, ALL by Name picklist. This way, the users would only have to be maintained in the Group and not in a manually entered picklist as well.

 

Thanks!

 

Matt

1 Kudo
BiggePLM

Filter BOM View

Status: New Idea
by Valued Contributor BiggePLM on ‎07-25-2014 11:55 AM

To aide breaking down of a BOM View into lists for different purposes the custom BOM view is great. But when you have multiple functional areas looking at that information such as Procurement, Fabrication, Wharehouse etc. it would be nice to be able to filter the list to show only items in the BOM that met a specific criteria. Similar to the way Excell uses it Autofilter.

 

The idea would be that you have a filter row you could pick or enter the filter than apply and the currently displayed view would get filtered to show only matching items (parent items could be included if that causes issues). This functionality would be used for both Nested and Flat BOM Views.

 

BD

7 Kudos

Hello,

 

it would be very useful to be able to clone existing reports one has created or clone reports other users have created.

Today we can't see how other users have created reports. Sometimes it is just easy to modify a report that somebody else has created.

Thank you

9 Kudos
dnaugle

Report Folders

Status: New Idea
by dnaugle on ‎06-18-2014 12:42 PM

The ability to move reports into a folder structure that could then be shared or made public would be helpful.

 

As the number of shared reports grows it can become tedious to find the one you are looking for.

 

If we had the ability to group reports into a folder (say by type or department) it would really help the user interface.

 

Thanks!

 

Dan Naugle

5 Kudos

Is there a chance that the same ability to move multiple dates out at the same time that is found in the milestones tab, can be replicated in the Project Management tab? With the complex way we are using PLM360 to support project management we cannot utilize the milestones tab.

 

That said we really like the ability to move multiple task dates out without having to change them one by one.

 

Is this possible?

 

Thanks!

 

Dan Naugle

11 Kudos
piggeej

More robust editor for Advance Print View

Status: Accepted
by Product Support on ‎04-17-2014 09:53 AM

It would be great and useful to have a more robust Advance Print view edtior, that included Tabs for full html editing, along with an attached CSS editor.

 

Example:

Tab one: current editor with ablity to add elements 

Tab two: Full html editor

Tab three: CSS editor

Tab four: Preview of edits not based on dmsID for layout views (color background etc...)

Status: Accepted
Hi piggeej, We appreciate you submitting your ideas and suggestions to us. We will add this to our feature list. Thank you, Trung
3 Kudos
ravidalli

Workflow version control, Export and Import

Status: New Idea
by ravidalli on ‎06-12-2014 03:30 PM

Hi,

 

It would be very helpful to have following workflow features:

 

1) Export a workflow from one enviornment to Import to Other.

2) It would be nice to have export and import done with all dependencies like Permissions, scripts etc. if not then Import shall display messages for missing dependencies and allow import only if all dependencies are in place. Like the permissions, roles and scripts.

 

Also on the workflow summary there should be an option(button) for complete information where each Transistion information including Condition script, Validation Script, Action Script, all other selectable options along with Escalation setup.

 

This would give user to copy this information and version control/document it. Also it can be compared against other enviornment setup.

 

As of today it is very easy to miss a setting when you are copying your workflow from Dev to Prod.

 

Regards,

Ravi Dalli

10 Kudos
dkeeley

Project Management Improvements

Status: Accepted
by Mentor on ‎04-10-2014 03:26 PM

Hi,

 

I feel there is a need for significant improvements to the project management tab. I have been using it for a while and I have a number of issues. Many of them have bee reported here already (e.g. ability to add columns). However there are some fundamental changes required to make this tab useful for managing anything other than simple projects. Some other issues are;

 

- it is essential that reports can be run on projects

- milestone dates must be able to be changed and modified through the project UI (regardless of whether they are linked tasks or not)

- milestones and milestone status should be visible in the gantt chart

- Selectable colours

- etc etc etc

 

I'm a huge advocate of PLM 360 but currently the PM tab is letting it down. I've used another web based project management system before that I think you guys should have a look at. Please PM me for the URL if you're interested.

 

Regards,

 

David.

Status: Accepted
Hi David, We appreciate you taking the time to submit this idea to us. We will add to our feature list. Thank you, Trung
4 Kudos
michael

Email an attachment directly from attachment tab

Status: Accepted
by michael ‎05-23-2014 12:18 PM - edited ‎05-23-2014 12:18 PM

It would be very helpful if there was a way to email an attachment directly from the attachment tab.  Currently you need to download the file to your local drive and then email it.

 

Thanks,

Michael

Status: Accepted
Hi michael, We appreciate you taking the time to submit this request. We will add this to your feature list. Thank you, Trung
1 Kudo

Streamline the process for setting up administrator rights including better documentation regarding the Administration [SYSTEM] group and the workspace-agnostic Special Permissions (Administer Users, Setup Administration, and Share Reports).  It took me a while to figure out exactly what gives users administrator rights, and I'm still not exactly sure what the pros/cons of the system-protected group is vs using those workspace permissions.  It's confusing and illogical to include the administrator permissions in the workspace roles.

 

Thanks.

You are not logged in.

Log into access your profile, ask and answer questions, share ideas and more. Haven't signed up yet? Register

Announcements
IdeaStation Guidelines
Review guidelines and best practices
before posting a new idea


PLM 360 Survey