Ok I just noticed something innoing. I can't copy coponent from one design to other by Copy/Paste option. Is it just me or the more updates to fusion the harder (more complicated) it gets. Is there a simlpe way to copy one component .body from one "tab" (design) to other? Thank you
Hi Yolmen,
The copy/paste components between designs works in direct design environment, and in parametric design environment, we can only paste the component without any designing history, so you have to follow below steps to paste your component between designs:
3. Paste the component to target design
Hi Sally,
I have attempted the method you describe to copy-paste a component from one design to another using the direct mode and it does not seem to work. Is there a trick to it?
Thanks,
Greg
Hi Greg,
Please check if you were trying copy/paste component like below:
1. Copy the root component node from browser? As the root node component cannot be copied, so you have to create a new component and move the bodies under root component to it.
2. "Paste"(including hotkey Ctrl+V) is NOT working for component paste between designs, however "Paste New" command could be working, you can invoke it from marking menu.
3. Copy/Paste only work in direct designing environment, you can:
a) Create Directly Design at the beginning
b) Switch to Direct modeling environment with command "Do not capture Design History" in Parametric design environment.
Currently, copy/paste sketches from browser only works in Direct Modeling environment. There is a workaround to copy a sketch node in Parametric Modeling environment, you have to edit the original sketch, and select all sketch geometry to copy, then paste them in a new sketch.
If you want to put one project design into another project, you can "control / left click" the file in the data frame of your projects and then "Insert ito Current Design". This is on a Mac but try something similar on a PC, I'll try it next time I am using a PC. This is pretty simple, so maybe not what you are trying to do.
Here's a way to copy a sketch into another design. Open the sketch for editing, window select everything in the sketch right mouse click and copy.
In the other design create a new sketch, left click the origin to select then right click will bring up a menu with the paste option.
Just click Paste and the sketch will be in the new design. This works with record history on, don't know if it'll work with it off.
Mark
Edit. This can be useful if you want to copy a sketch to a different plane with in a design as well.