Believe me, I am looking forward to the day when my entire complex is
recorded a in Building Systems-type format. ;)
how long? and what's the cost? I don't know that autodesk has an immediate
answer for me, not to mention the other portions (site surveys, you know,
with so much space changing over the past 90 years or so...)
"BHashman" wrote in message
news:26125688.1101276924643.JavaMail.jive@jiveforum1.autodesk.com...
> Thanks for the post. I have signed up for some of these classes. I will
> get over to you at lunch but my main interests lie in your future so I
> will have feathers a flyin as I try to sit at two tables.
>
> Where I want to see FM lead to is inside the building and into the ceiling
> and below the floor to see and document the MEP systems. This will occur
> soon with ABS building a head of steam. Well at least it better because
> the client already wants it and I already sold it.
>
> But now, oops, I sound like the salesman!! Hopefully, though, the right
> kind of salesman. I don't want to sell you anything. I am already telling
> clients that AC can solve their FM/MEP record drawing and as built
> problems. Hopefully this proves true.
>
> See you there.
> Bill