Hi, I'm trying to understand what is mean of the different report results of "transportation" and "Machine".
I am trying to reproduce a concrete batch plant with 2D Layout factory.
I have a Sand BIN, a Cement Silo and a Concret Mixed.
To try I put the Mixer with a energy consumption 1kW.
Then at the Routings for the operation of mixer I put 60minutes.
There are two Mixer Jobs, then I think could be 120 minutes.
When I display the "Machine" report appears 250KWH.
I have tried every way, and cannot understand why happens this.
Any idea?
Attached the file.
Solved! Go to Solution.
Solved by jorge.lopera. Go to Solution.
Solved by XuesongBai. Go to Solution.
Hi,
Let me explain that:
Total Power Consumption (kW.h) = (setup time + processing time) * Part Quantity * Energy Consumption Rate at each operation for all jobs
(Unit of setup and process time should be converted to Hour.)
For Job arena:
Step time =0+0=0
Process Time=0+60min=60min=1hour
Total Power Consumption (kW.h)_arena=(0+1hour)*150*1KW=150KW.H
For Job cemento:
Step time =0+0=0
Process Time=0+60min=60min=1hour
Total Power Consumption (kW.h)_cemento=(0+1hour)*100*1KW=100KW.H
So Total Power Consumption for all jobs= 150+100=250KW.H
Thanks,
-Xuesong
Thanks Xuesong,
It is enough to solve my question.
Do you think that this equation may be explained at wikihelp?
Thanks