Plant BOM management

0 REPLIES 0
Reply
Message 1 of 1
Arun_Kumar_K
359 Views, 0 Replies

Plant BOM management

Plant BOM management is the one which will differentiate Plant3d from any other softwares if it is implimented from Autodesk. This should to be a part of Plant report creator.

 

This should work as below:

 

1. There should be a option available for user in plant report creator to select the line numbers for issue.

 

2. Here, the user selects the required line number for issue to procurement.

 

3. If the user satisfies with the report generation, he has to lock the line numbers for issue. The software should lock the BOM for the selected line numbers as Rev.0

 

4. Say, After a month goes, many modifications could have made in the plant3d of the specified line numbers. Here, the user wishes to release the additional BOM along with "Not required items" from the previous release.

 

5. The user has to go to Plant report creator, should select the required line numbers. A window should appear with msg "Full BOM .... or Additional BOM....or "Not required items". The user has to select  the Additional BOM.

 

6. The software should segregate the addition based on "ERP part Nos" or by any means specified by the user and should display the additional materials, similarly for "Not required items".

 

Dreaming this will be part of Plant report creator in future.