When e-transmitting a drawing set the fixture schedule blanks out except for the header text. The fixture schedule is not on the same drawing as the light fixtures. I have tried both exploding, bursting and binding the drawing. However still no AMEP generated schedules. Is there a way to have this schedule without the DB file?
Thanks
Ken