I've created the attached table (used as legend in drawing, to point out revisions).
Cells in second column from the left are set as data dd/MM/yyyy, so when I change revision I write current data and it give correct format.
The problem is that every time I change layout and come back (or every time I open the drawing), data in empty cells were set to 01/01/1970...but I want them empty.
If I clean them, I clean also the data format.
Thanks a lot
Welcome to the Autodesk Forums!
Hi,
If I unlock cell format in Properties palette, than I'm able to remove 01/01/1970 from cells.
Then I can lock format of the cells and "default date" doesn't reappears.
Maxim