Hi Adrian,
You can do this quite easily with a program in VBA. The progam would
rely on the "Current" alignment being either a constant name - or
something which can be derived from the drawing name, or project name.
Ultimately a program cannot make reliable jusdements for something like
this unless you have a very structured process.
Regards
Laurie Comerford
Adrian wrote:
> Is there a way to automatically set current the alignment when load a
> drawing? I know the alignment name is stored in the profile block but I do
> not know how to get it to use it in a routine that can be loaded with the
> drawing. I use Land Desktop 2004 and usually we the same name for alignment
> and drawing.
> Any suggestion will be appreciated.
>
>