Hello,
I'm new to autocad electrical spreadsheet to PLC I/O utility function.
1) I can create termination drawings using this function but if i make changes to the root excel spreadsheet, they are not duplicated on the termination drawings.
I have to delete all the drawings and repeat the whole process again. Is there a faster way to update the termination drawings if the excel spreadsheet is changed??
2) I have attached a termination drawing created using the I/O utility. The problem with this termination drawing is that it does not connect the source arrows back to the PLC I/O. So i have to manually put wires there. Any thoughts why its doing that?