I’m using SSA 2011 and trying to determine the minimum storage volume required for the pre- and post-developed runoff at a specific point for a development. When I follow the example, as shown in Chapter 5 of the User’s Guide, I can look at my existing and proposed hydrographs (Time Series Plot) but I don’t get any output data in the Total Inflow Summary Table at the bottom of the screen. Am I missing a toggle button that turns on this information? Is there something in the Project Options that I need to set?
I've attached a screen shot of what I’m talking about. I thought perhaps my particular project may have had some bugs in it, preventing the data from being shown. Therefore, I used SSA’s sample projects to try and recreate what was happening. Sure enough, I still can’t view any data. The attached image is from one of SSA’s sample projects that comes with the software.
Any ideas or suggestions?
Thanks!