I have been grading out a proposed building pad using feature lines and points. From this proposed pad I graded down to an existing surface that I had already created using existing contour lines.
After I finished the proposed pad I decided I needed to raise it two feet to help even out the cut/fill volumes. When I did this my daylight did not update.
Anyone know how to get the daylight to update so its shows the contours until they match up with the existing surface?