I am currently using the LinkSlopeToElevation subassembly, with a -25% slope and it isn't calculated the offset correctly... for example on a elevation difference of 1.42 it is calculated the offset to be 11.61 instead of 5.67. I can't seem to figure out why it isn't working for me.
Chris