Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type.
Showing results for
Show only
|
Search instead for
Did you mean:
This page has been translated for your convenience with an automatic translation service. This is not an official translation and may contain errors and inaccurate translations. Autodesk does not warrant, either expressly or implied, the accuracy, reliability or completeness of the information translated by the machine translation service and will not be liable for damages or losses caused by the trust placed in the translation service.Translate
I have created 2 separate pipe runs; new run and proposed run. I want to connect the end of the propsed run to a point in the existing run. How do I connect it and how do I hold the invert at the connect to the existing?
You may want to post in the land Desktop forum but:
You will need to have a node on the existing run. Then snap the end of the
proposed run to the node. You can adjust the invert in the editors, either
graphical or db.
Hope this helps,
conan witzel