I have created a "base" file which includes x-refs to all water, storm, roads, manholes and sewer pipes. From that file, I am creating sheet sets for each section of sewer than we are rehabilitating.
My question relates to labeling work flow. Currently, I label all pipes and manholes in the "base" file, then create the sheet in the sheet set. The problem is that when I open the sheet, the labels are often in the wrong location, or covering other important information. Is there a better, correct procedure for labeling? Should I be labeling everything in the sheet rather than the "base" drawing? The problem is that when I click on a structure to label it in the sheet, it sees the structure as an x-ref back to the "base" drawing.
Any help appreciated...thanks.