Does anyone know how to use this and can give me a clear step by step instructions. Everything I have searched and tried did not work and I am wondering what I have done wrong. I currently have 2 assemblies for a twinned highway (East bound and West bound) and I want to link them together with a ditch which may or may not have a flat bottom (it will depend how deep it gets). They are both in the same corridor using 2 regions and 2 alignments.
Do I have start from scratch with my assemblies (I sure hope not)
Thanks
Wylde
Have a look at "Marked Point". I believe you'll want to place one in an assembly for one of the two roadways. Then within the assembly for the other roadway, use a "LinkToMarkedPoint".
Don Ireland
Engineering Design Technician