how to Define Vegetable soil Thickness when Calculating Earthwork Volumes

3 REPLIES 3
Reply
Message 1 of 4
nimadadgar57
679 Views, 3 Replies

how to Define Vegetable soil Thickness when Calculating Earthwork Volumes

when i want to Calculate Earthwork Volumes there are some factors : 

 

  • The Cut factor is typically used as an expansion factor for excavated material. It is usually 1.0 or higher.
  • The Fill factor is typically used as a compaction factor for fill material. It is usually 1.0 or higher.
  • The Refill factor indicates what percentage of cut material can be reused as fill. It should be 1.0 or lower. 

but no one aren't use full for exactly Define the Vegetable soil Thickness in cut and fill, is there another way?

 

 

C3D 2012,

AMD phenom II 3.4GHZ 6 core CPU,

16 GB RAM DDR5,

60GB SSD + 1000GB HDD
NVidia Quadro 4000 running driver version 276.14 without Performance driver

Win 7 64-bit professional,

 

   

3 REPLIES 3
Message 2 of 4
tcorey
in reply to: nimadadgar57

If this is a constant value you could copy the og surface, raise it the thickness of the veg surface, and then use Volumes to compare the two surfaces.

 

It's not a 'factor' but it makes it fast and easy to get the number.



Tim Corey
MicroCAD Training and Consulting, Inc.
Redding, CA
Autodesk Gold Reseller

New knowledge is the most valuable commodity on earth. -- Kurt Vonnegut
Message 3 of 4
KirkNoonan
in reply to: nimadadgar57

That's also how we do it. Paste the existing ground surface into a stripped surface and lower the stripped surface by 6 inches, or however much it needs to be. That way you get a rough volume on stripping  and you take the revised eg into account when filling back up again.

Message 4 of 4
neilyj666
in reply to: KirkNoonan

I use this approach:

 

Input the organic soil thicknesses obtained from trial pits/boreholes etc etc into Civil 3D such that the Z value is the thickness in your local units e.g. 0.3m, 0.25m, 0.175m etc and call it e.g. SOIL THKS

 

Create a volume surface (VOLSURF) with SOIL THKS as Base and EGL as Comparison surface to give a volume surface where the Z value is the level of the base of organic soil

 

Create new Surface (BASE OF SOIL) and paste VOLSURF into it and now you have a normal TIN surface of Base of Soil to use as required. This surface remains dynamic so any new soil thickness info is automatically included.  This method assumes interpolated soil thicknesses between site investigation locations (which may not be a valid assumption) so additional dummy thicknesses may be needed as required.

 

A similar technique can be used to create base of construction (i.e. earthworks formation) level surfaces knowing the finished levels and construction thicknesses e.g. heavy duty road, footpath, landscape area etc.

neilyj (No connection with Autodesk other than using the products in the real world)
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.

EESignature


AEC Collection 2024 UKIE (mainly Civil 3D UKIE and IW)
Win 11 Pro x64, 1Tb Primary SSD, 1Tb Secondary SSD
64Gb RAM Intel(R) Xeon(R) W-11855M CPU @ 3.2GHz
NVIDIA RTX A5000 16Gb, Dual 27" Monitor, Dell Inspiron 7760

Can't find what you're looking for? Ask the community or share your knowledge.

Post to forums  

Rail Community


 

Autodesk Design & Make Report