I'm doing a street corridor design. There's a railroad crossing right in the middle. We are not redoing the railroad crossing. It is being left "as is".
Would you do 2 separate corridors, one on each side of the railroad crossing?
Or, would you do a single corridor, with a blank space in the middle where the railroad crossing is?
I'm leaning to 2 separate corridors, but am open to ideas. Thanks.
I would do one and hide the region at the tracks. This would eleiminate coordinating two PGL's
Joe Bouza
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.
I would use 1 corridor with a gap at the tracks. Be sure to add a gap into the earthworks as well so that you don't have the volumes carry across the tracks.
I might use 2 corridors if I needed to have a second person work on the project and the track would be the split for the work load.
Cheers,
Peter Funk