We just did a sever migration to a new system. We have stand alone ADT
stations. I corrected entities in the profiles used that had pointed to our
old server. That solved most issues with very slow routines (detail
manager, etc). It did not help with the etransmit function. Where else do
I look to get etransmit working normally again? It has got to be doing
something inside the routine that is looking for the original server. The
routine does function but takes 3 minutes to get to the dialog box for a
single drawing transmit job. Any assistance would be greatly appreciated.