Ok...so my question is how do I extract the door thickness for my schedule
3'-0"x 7'-0"x1 3/4"
I need the 1 3/4" portion. I don't see this exposed in ActiveX. Or I
maybe overlooking it.
Additionally why would the Door.Thickness return the Width. Those are 2
different variables. Length, Width, Heigth
Were does Thickness far in the 3?
Currently I have my code set up to add
& "1 3/4"" to the end of the combined width and height. When the time comes
and I have a door that is different I need to know how to change this.
Thanks
--
Rob Starz
rob@stardsign.com
Plogv 3.0 & 2000 (plot logging) for r14 & 2000
***Enhancement Tools for Arch. Desktop *****
http://www.stardsign.com/main.htm
StarDsign cad solution
"Scott Arvin [Autodesk]" wrote in message
news:BC2C22D128D51F1DD51340627097EFC4@in.WebX.maYIadrTaRb...
> The thickness of the door leaf is the same as the thickness of the door
> itself.
>
> The LeafWidth value should only apply to Uneven door styles.
Unfortunately,
> the default value is set to 12 and that is what's returned whether or not
it
> is an uneven door.
>
> Hope this helps.
>
> Scott Arvin [Autodesk]
>
> "Rob Starz" wrote in message
> news:1BC5C25C182FFA70F0B805AF5B10166C@in.WebX.maYIadrTaRb...
> > Ok....I think I lost it or I am in a twilight zone episode.
> >
> > to get the thickness of the door leaf I would use
> >
> > door.LeafWidth
> >
> > door being an AecDoor
> >
> > I am getting a value of Zero for all my doors.
> >
> > Peter and Mark...this is part of the code I sent you back regarding the
> Item
> > issue. My VBA code was only setting the schedule to Width x Height but
I
> > realize I forgot Thickness. So I tried the above syntax and I get 0.
> >
> > I probably and looking at the wrong thing.....please say so.
> >
> > Thanks
> >
> > --
> > Rob Starz
> > rob@stardsign.com
> > Plogv 3.0 & 2000 (plot logging) for r14 & 2000
> > ***Enhancement Tools for Arch. Desktop *****
> > http://www.stardsign.com/main.htm
> > StarDsign cad solution
> >
>