We are new AEC Project.
When creating a multiple sheets set of building plans using Acad Project, what is the correct way to handle the different trades version of the data.
I.E. I have the building outline of a project approx 14 sheets that illustrates the out line of the wall and columns.
Do I create another project for electrical or do I add to the current project?
Which is best for multi-users?
If you mean an ACA "project" using the Project Navigator I would have all in one project.
You can create the various categories for MPE as needed which will allow multi users to work on the various files.
Thank you for your inquiry and thank you for your post Leo. In this case I have posted a helpful link to a document below with an overview of this relationship within project navigator. Please let us know if the answer above combined with the detailed information below/attached helped in answering this post. Thank you.
PN Overview/concept Part 1(Specifies 2008 but is applicable in nature throughout all versions of PN): http://www.aecbytes.com/tipsandtricks/2008/issue27-autocad_arch.html
PN Overview/concept Part 2(Specifies 2008 but is applicable in nature throughout all versions of PN): http://www.aecbytes.com/tipsandtricks/2008/issue29-autocad_arch.html
Helpful video on overview: http://www.youtube.com/watch?v=cpULIqy_ib0&feature=PlayList&p=87A4F0A61DFADBF7&playnext_from=PL&inde...
Skill Builders (AEC Content and tools within ACA): http://usa.autodesk.com/adsk/servlet/index?siteID=123112&id=12785476&linkID=9240655