AutoCAD 2010/2011/2012

AutoCAD 2010/2011/2012

Reply
New Member
elmasry.ayman
Posts: 1
Registered: ‎02-11-2012
Message 1 of 2 (396 Views)

Arithmetic operation in a position field

396 Views, 1 Replies
02-11-2012 12:31 AM

Hi, I'm using a position field as an attribute for a block. This is what I use:

 

%<\AcObjProp.16.2 Object(%<\_ObjId 2118086344>%).InsertionPoint \f "%lu2%pt2%pr4%ps[+, M]%ct8[0.001]">%

 

What I would like to do is an arithmetic operation of addition, something similar to how 'CAL works. In this particular case I would like to add the value of 100,000 before the conversion factor, or 100 after the conversion factor.

 

Thanks.

*Expert Elite*
vladimir.michl
Posts: 255
Registered: ‎09-17-2006
Message 2 of 2 (371 Views)

Re: Arithmetic operation in a position field

02-12-2012 01:36 PM in reply to: elmasry.ayman

Yes, you can add values to automatic properties. See the tip:
http://www.cadforum.cz/cadforum_en/qaID.asp?tip=6381
 
The resulting expression will look similar to:
%<\AcExpr (100+%<\_FldPtr 305306904>%) \f "%ps[+, M]">%
and
%<\AcObjProp Object(%<\_ObjId 2129671616>%).InsertionPoint \f "%lu2%pt2">%

 

Vladimir Michl, www.cadstudio.cz  www.cadforum.cz


Post to the Community

Have questions about Autodesk products? Ask the community.

New Post
Need installation help?

Start with some of our most frequented solutions or visit the Installation and Licensing Forum to get help installing your software.