I've been working with a test server in preparation for upgrading to 2013. I installed ADMS 2013 server and restored a backup on the test server. I want to use the new ability of having a 2012 client attach to a 2013 server so as to only upgrade the sever to start. I can connect to the 2013 server with the vault 2012 client and am able to check files out. However , when I open the files with Inventor 2012, it says they are not checked out. If I check them out through Inventor, they are checked out from the 2012 server. I guess when I actually upgrade my 2012 server to 2013 there will only be one server but I still wonder why Inventor keeps going to the 2012 server in my test environment. Is there some project file or setting that's causing this? I'm using the same project file that I used on 2012 and have also tried creating a new one. WOrkspaces are the same. Thanks
Inventor 2012 & 2013
WIndows 7
Vault server 2012 & 2013
Solved! Go to Solution.
Solved by olearya. Go to Solution.
Hey there,
You are logging into the wrong server via Inventor - you need to log out of Vault inside Inventor and change your log in details to point to the new server.
You can move back and forth between the production and test server but its important you keep track of which server you are logged into so as not to mess up any important data!
Hope this helps.