Hello
I have a question that I hope somebody can help answering?
I'm using Vault, and has a larger assembly, with a lot under assemblys. When I make an update in the larger assembly, then I have to manually update all my drawings, so i check it out updateing it, and check it in.. It takes so much of my time.. (15 drawings)
So my question is: Do anyone know if there are a way I can Updating them all at once? Without opening each drawing?
Regards Mathias