Hi folks,
twice I did set up a real process in moldflow with ram speed (mm/s) over ram position (mm). Both times injection time was much shorter than in the real process?
Any hints why this could be?
Philipp
Hi,
as you get a shorter fill time than expected, it has a higher flow rate than expected.
A reason can be the screw diameter.
Did you set the screw diameter the same as in real process?
It is set at:
Process settings, Advanced Options...
Injection molding machine > Edit...
tab Injection Unit
Machine screw diameter
Hope this helps.
Regards,
Berndt