My CPU is only operating at 3% during the meshing and pre-solve process.  Sometimes this takes a long time (up to 2 hrs) on large models.  Is there some way you can change the system so the computer uses all of its processing power during this time period. 

3 Comments
LKania
Alumni

Tom,

 

  You might try setting the flag 'mesh_multicore' which will thread the volume meshing process across as many cores as you care to enable. The flag manager defines its usage.

eyaln
Participant

I was checking my setup and found

 

Value = A

 

How many CPU's are involved in the mash?

LKania
Alumni

Both surface and volume meshing operations are, by default, serial processes and will run on a single core. By way of the flag I described above, you can enable threading of the volume meshing operation and can devote as many cores to this process as you like.