Can someone tell me why Revit saves every single pipe slope that I start & end with & is there a way to get rid of them? I have 214 of them & every time I look for a pipe height that I actually use I cannot find it or end up clicking on a number like 11' 6 113/256" which totally messes with me & puts a transition in. Am I too picky?