The project:
It is one massive building site with multiple project on it.
Every project has its own revit model.
Underneath these 10 projects there is yet another model, which is a parkinggarage. And is going 1 level underground and 1 level above the ground.
In the part where its above the ground are windows, doors and wall openings.
Is there a way to the calculated total of the windows, doors and wall opening on the one level above the ground?
Well, i was assuming you want a schedule only with the windows from the garage building. If you want you can schedule all the windows in the project and group them by level, so the info is there anyway.
Gustavo
And, i tested this right now, you can filter the schedule by RVT link name, so you can have a schedule only with the windows from your garage, even it's not filtered by level.
Next time i´ll think more before i post.
Gustavo
Hi,
If you want a Window or Door Schedule with all linked revit file then please follow my image file. Just turn on the Red Marked zone. It will work smoothly. Try with it.
Thanks & regards,
Subhradeep Sen
Kolkata