Renumber Doors

2 REPLIES 2
Reply
Message 1 of 3
Anonymous
337 Views, 2 Replies

Renumber Doors

During a project, doors change until the construction set is issued. The schedule capability is great (8.1). But, I would like to set the sorting by floor and type. Then, renumber the doors thru schedule instead of item by item.

Is this possible?

Thanks,
cad2Revit
2 REPLIES 2
Message 2 of 3
RevitIt
in reply to: Anonymous

Sure. Adjust your schedule as needed and then use that schedule to renumber.
See the attach pic
Message 3 of 3
Anonymous
in reply to: Anonymous

All you gotta do is add Level as a Field then sort it by Level and then by
Mark.

wrote in message news:5231149@discussion.autodesk.com...
Sure. Adjust your schedule as needed and then use that schedule to renumbe