Hi all,
I'm having some issues with phasing. I have demo, existing, and new construction set up. The existing equipments are all drawn up, some are demolished and some are to be relocated in various locations. How do I control the families that need to be relocated in the new construction. If I move any of the objects/families in the new plan, the demo and existing changes as well. If I hide the family, it only hides in that view. The other dependent views still have the equipment showing up. Is my only option to manual hide all of them?? Isn't there a better way to do that?? Thanks in advance. I would really appreciate your help.