This is possible. In the sketch, trace the path for the first flight, do the second flight after a U turn, then make the other U turn, and trace the third flight over the first one. Before doing this, of course, the base and top level settings in the stair properties dialog box have to allow room for all those steps.
Alfredo Medina
info@planta1.com
Alfredo Medina _________________________________________________________________ ______
Licensed Architect (Florida) | Freelance Instructor | Autodesk Expert Elite (on Revit) | Profile on Linkedin