Community
Several buildings are linked and share coordinates. How can the host file be used as the datum base Finish Floor 0 and all the other buildings relate, even though at different elevations of floor levels? Right now the sections show FF 0 for all of them and they are at different heights.
Thanks
Please review the information in this link. http://wikihelp.autodesk.com/Revit/enu/2014/Help/0001-Revit_Us1/2341-Collabor2341/2526-Shared_P2526
Thanks for posting.