In a recent meeting wtih cilent, we asked her to review the Finish Schedule. She pointed out that one of the ceilings was supposed to be gypsum board rather than ACT. Looking on our RCP, it was showing gyp board, but the schedule, which is populated from the Room Properties, was calling out (the non-updated) ACT 2x2.
Is there some way to link the ceiling type directly to the finish schedule directly, rather than make double changes (updating the room properties and the actual ceiling type) in order for the proper information to be showing? Seems odd and not very useful to have this kind of redundancy and something that should have been worked out long ago in Revit.
Thank you in advance for any suggestions or feedback!
No. Data from rooms and ceilings are not connected in schedules.