Using BOM Total Cost to calculate other fields

3 REPLIES 3
SOLVED
Reply
Message 1 of 4
lcowgill
606 Views, 3 Replies

Using BOM Total Cost to calculate other fields

I would like to use the data field that is calculated in the BOM tab for total cost as a factor in a Computed Field Formula. A use case examples would be:

 

To calculate the cost of a certain lot size, or to add additional costs to BOM costs to calculate total costs.

 

How can the Total field from the BOM tab be used in a Computed Filed Formula?

3 REPLIES 3
Message 2 of 4
jpiggee
in reply to: lcowgill

Lyn,

The feature you are looking for is not available as of yet, however this feature is being worked on and you will have access to the information on the BOM tab shortly.

Joseph Piggee
Fusion 360 Administrator
TPI Composites
jpiggee@tpicomposites.com
Message 3 of 4
chloe.watmore
in reply to: jpiggee

Hi,

 

I found this post from 2013... Is this still unavailable? It would be very useful to use BOM totals in calculated fields elsewhere in the workspace.

 

Chloe

Message 4 of 4
dvirh
in reply to: chloe.watmore

Hi Chloe,

 

In Fusion Lifecycle, the BOM is configured for a given day ('today' by default) and for a given bias. This means that the same BOM configured for different dates or different biases can (and often does) have different total costs. For this reason, we cannot make that value available for downstream calculations.

 

 

Hagay Dvir
Engineering Manager
Fusion Manage
Autodesk, Inc.