19 REPLIES 19
SOLVED
Reply
Message 1 of 20
cadman777
3348 Views, 19 Replies

degrees of freedom in 3d sketch

Does anybody know a way to check the "degrees of freedom" of entities and vertices in 3d sketches?

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
19 REPLIES 19
Message 2 of 20
cwhetten
in reply to: cadman777

Other than moving the vertex around?  If you right-click the vertex and choose "3D Move/Rotate", you can use the triad to move it.

 

I don't know if there is a "Show degrees of freedom" option like there is for a 2D sketch...

Message 3 of 20
cadman777
in reply to: cwhetten

Yeah, that's what I already do.

but when my 3d sketches show some green lines (not all black), I know they are not completely constrained.

How can I find out how to completely constrain them?
Do you know a good link that explains the details of this?

Incidentally, none of the vertices move along any of the 3 axes, meaning they are all completely fixed.

So why would some of the lines show up green?

See attached sketch.

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 4 of 20
cwhetten
in reply to: cadman777

I've noticed that sometimes 3D sketches will do that.  The entities are fully constrained, but the colors don't update to reflect this.  When I dragged the vertex in your first 3D sketch, it didn't move and the colors updated to show as fully constrained.  But, when I exited the sketch, they went back to unconstrained colors.

 

It's annoying, and frankly I think it's a bug.

 

-cwhetten

Please click "Accept as Solution" if this response answers your question.

Message 5 of 20
cadman777
in reply to: cwhetten

Thanks.

That's all I need to know.

I wonder why Adsk refuses to fix thse age-old defects in theri software??

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 6 of 20
JDMather
in reply to: cadman777

Nearly all of my 3D sketches are created and controlled by 2D sketches.

Can you attach a file that exhibits this behavior?


-----------------------------------------------------------------------------------------
Autodesk Inventor 2019 Certified Professional
Autodesk AutoCAD 2013 Certified Professional
Certified SolidWorks Professional


The CADWhisperer YouTube Channel


EESignature

Message 7 of 20
cadman777
in reply to: JDMather

JD,

Yes. Just scoll back up the page and you'll find one.

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 8 of 20
JDMather
in reply to: cadman777

oops, I missed that attachment.

I would use 2D sketches to create and control (might not even use 3D sketch at all for that).


-----------------------------------------------------------------------------------------
Autodesk Inventor 2019 Certified Professional
Autodesk AutoCAD 2013 Certified Professional
Certified SolidWorks Professional


The CADWhisperer YouTube Channel


EESignature

Message 9 of 20
cadman777
in reply to: JDMather

JD,

 

Every time I do a job, I consider whether or not to use a "proven" method that has problems, or trying to invent a new method to do things.

 

This time I wanted to try 3d sketches to see if they don't break when things change. That's the problem I consistently encounter when using projected entities between sketches.

 

How do you propose keeping projected entities btw sketches from breaking when dims and geometric shapes change?

 

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 10 of 20
cadman777
in reply to: cadman777

Now that I'm working these 3d sketches, it seems like this problem happens only with angled lines.

I realize there's no such thing as an angled line in 3d space. Probably has something to do with construction planes and orthographic basis of the 3d sketches?

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 11 of 20
cadman777
in reply to: cadman777

JD,

 

You said:

 

"I would use 2D sketches to create and control (might not even use 3D sketch at all for that)."

 

Would you care to explain how you'd do that?

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 12 of 20
JDMather
in reply to: cadman777

I can't help but feel that I must be missing something?  (see attached)

(this could have been done all 2D sketches if I had created a couple more workplanes)

 

Even when I have complex bends I use 2D sketch to control the 3D sketches.

http://home.pct.edu/~jmather/content/DSG322/Inventor%20Tutorials/Inventor%2011%20Tutorial%207.pdf


-----------------------------------------------------------------------------------------
Autodesk Inventor 2019 Certified Professional
Autodesk AutoCAD 2013 Certified Professional
Certified SolidWorks Professional


The CADWhisperer YouTube Channel


EESignature

Message 13 of 20
cadman777
in reply to: cadman777

JD,

 

Thanks for the pdf. I learned something in it: You don't have to extrude surfaces to intersect the sketches.

 

Your attachment was too new for my program. I have IV2010. So I couldn't view it.

 

My biggest problem is that projected entites from sketches break when I resize the model.

 

The best work-around I've come up with is to use work points at vertices and other critical location points.

That way, when the model changes, the points update, and they maintain their projected statuts as both derived entities and as part of parent ipt file.

 

The other biggest problem I have is w/frame generator.
Assembly features always break (e.g., holes & cuts) when the underlying wireframe changes dimensionally.
I learned to use frame generator only when I'm certain that the parts won't get modified with assembly features.

Otherwise, I'm asking for a load of work when the customer changes things.

 

I wonder how others have dealt with these 2 kinds of defects in the software?

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 14 of 20
JDMather
in reply to: cadman777


@cadman777 wrote:

JD,

 

Thanks for the pdf. I learned something in it: You don't have to extrude surfaces to intersect the sketches.

 

Your attachment was too new for my program. I have IV2010.


 

 

I am aware that it is no longer necessary to extrude the surfaces - those tutorials were written years ago and I haven't had time to update.  In my class we do the problem differently.

Too bad you couldn't open my 2013 file - you are doing wayyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy  (if you didn't notice I added more yyyyyyyyyyyyy than my usual response) too much work.  Your problem is really fairy trivial as far as I can tell.  I think there is an easier more robust way.

 All dimensions are in Sketch1 & 2.

Wireframe.png


-----------------------------------------------------------------------------------------
Autodesk Inventor 2019 Certified Professional
Autodesk AutoCAD 2013 Certified Professional
Certified SolidWorks Professional


The CADWhisperer YouTube Channel


EESignature

Message 15 of 20
cadman777
in reply to: JDMather

JD,

 

Thanks for the screen shot.

If I understand your screen shot correctly, then it looks like you did it the way I usually do it.

 

Here's how I interpret your screen shot:

The green lines are in Sketches 3 & 4 as "projected" lines, and the red lines are in the 3d sketch connecting to the 2d end points.

 

If that's true, then here's what I normally encounter:

The green lines will "break" (= disconnect associativity) from their parent sketch entities.

I use the parent sketch to make planar "patches" and "thicken" them into separate "sheetmetal" parts (= derive the parent sketch into individual sheetmetal files). When I change the parent sketch, the patch breaks b/c the projected entities break inside the parent sketch (= the derived ipt).

 

So, the project I'm currently working on provided an opportunity to try a new method using mostly 3d sketches for the main shell, in an attempt to keep the sketches from breaking.

 

I used projected points derived from work-points, instead of projecting sketch entities (which break). It seems to work better than my "normal" method, even with 2d sketches and work-plane placement.

The caveat to this method is, the wireframe ends up being cluttered with work-points (and work-planes, in the case of using 3d sketches).

 

One more notable:

I began with the top plane sketch, per my original (unlike yours), b/c in "real life", that "flange" (heel outline) doesn't change. In other words, I built the model like we build the part in real life.

The way I make the wireframes is by placing the "knowns" into sketches, and working around them, which is why it seems so complicated. If I don't do it that way, I get very confused when I'm "deep" in a model. It's a very simple way to keep things mentally-categorized.

My "method" may not represent "good modeling practice" from a software training perspective, but it is the most efficient way I've discovered, due to "job-site reality".

 

Sometimes, like in this case, we end up adding "realities" into the wireframe after the model is all finished. That happened in this case 2x. One time the model totally changed, which you'll see in the attached sketch. Those little changes (i.e., adding an additional "flange" and changing from a sloped "skirt" to vertical) cost the customer 8 hours of modeling & drg scrubbing time. Had I done my model like I normally do (which is same in principle to how you did yours), I would have wasted an extra day on it.

 

Customer changes present quite a challenge when doing my projects. I have to "anticipate" those changes and build them into my original wireframe, which is what makes me push for unbreakable projected sketch entities.

 

So, I'm just trying to find a way to keep the wireframe projected entities from breaking when things change, since that's a normal part of my project-work.

 

Having said that, let me ask you this:

 

Do your green lines break associativity when you change the dims on sketchs 1 & 2, after you have your model all built in the iam file?

 

If not, then if you were me, what method would you use to prevent my wireframe/model from breaking?

 

Find attached an example similar to what I normally would do to make this hopper. Please note that it's a quick revision of the latest "evolution" in my original 3d wireframe, so it's very cluttered, due to many customer changes. Also, I omitted the myriad of details, such as manways door, flg profiles, &tc.

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 16 of 20
cadman777
in reply to: cadman777

Find attached a screen shot of the finished model.

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 17 of 20
JDMather
in reply to: cadman777


@cadman777 wrote:

JD,

 

Thanks for the screen shot.

If I understand your screen shot correctly, then it looks like you did it the way I usually do it.

 

Here's how I interpret your screen shot:

The green lines are in Sketches 3 & 4 as "projected" lines, and the red lines are in the 3d sketch connecting to the 2d end points.

 

If that's true, then here's what I normally encounter:

The green lines will "break" (= disconnect associativity) from their parent sketch entities.

 

I used projected points derived from work-points, instead of projecting sketch entities (which break). It seems to work better than my "normal" method, even with 2d sketches and work-plane placement.

  

If not, then if you were me, what method would you use to prevent my wireframe/model from breaking? 


I normally only project points if I expect there will be changes that would cause projected lines to "break".
Sketch the lines myself.  I rarely project lines or part edges unless I know that geometry isn't likely to change.

In cases where I project part edges (doesn't look like the case here) I turn it into construction and sketch my own lines overtop the projected lines.

Much easier to fix if things change too much that projected points go sick.

I mostly avoid 3D sketches accept as controlled by 2D sketches.  If the work is all planar then I rarely use 3D sketches even though it is pretty easy to connect dots between the 2D sketches.


-----------------------------------------------------------------------------------------
Autodesk Inventor 2019 Certified Professional
Autodesk AutoCAD 2013 Certified Professional
Certified SolidWorks Professional


The CADWhisperer YouTube Channel


EESignature

Message 18 of 20

Hi cadman777,

 

I did not read the entire discussion, but I wanted to point you to this link in case it helps:

http://forums.autodesk.com/t5/Autodesk-Inventor/Combining-2d-and-3d-sketches/m-p/3735908#M456488

 

It's common for users to want to use 3D sketches to create wireframes for FrameGenerator models, but it's almost never needed, or ever as robust as using solids or surfaces from 2D Sketches.

 

I hope this helps.
Best of luck to you in all of your Inventor pursuits,
Curtis
http://inventortrenches.blogspot.com

Message 19 of 20

Curtis,

Thanks for the info.

The Wiki site looks useful.

I'll try it some time.

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator
Message 20 of 20
cadman777
in reply to: JDMather

JD,

Thanks for the affirmation.

"I normally only project points if I expect there will be changes that would cause projected lines to "break".
Sketch the lines myself.  I rarely project lines or part edges unless I know that geometry isn't likely to change.

In cases where I project part edges (doesn't look like the case here) I turn it into construction and sketch my own lines overtop the projected lines.

Much easier to fix if things change too much that projected points go sick.

I mostly avoid 3D sketches accept as controlled by 2D sketches.  If the work is all planar then I rarely use 3D sketches even though it is pretty easy to connect dots between the 2D sketches."

This is what I'm glad you said.

Any idea if Adsk will fix this issue in the future so IV projected sketch entities don't break when the parent sketch changes?

... Chris
Win 7 Pro 64 bit + IV 2010 Suite
ASUS X79 Deluxe
Intel i7 3820 4.4 O/C
64 Gig ADATA RAM
Nvidia Quadro M5000 8 Gig
3d Connexion Space Navigator

Can't find what you're looking for? Ask the community or share your knowledge.

Post to forums  

Autodesk Design & Make Report