We have a fairly large project in InfraWorks that went from 170MB to >800MB in the last two days. It now takes so long to Synchronize the model with 360 that we haven't been able to sync since Monday. We have several designers working on the model and would really like to synchronize them.
Any ideas how we can reduce the file size?