• Industries
  • Products
  • Buy
  • Services & Support
  • Communities
  • Discussion Groups

    Autodesk Robot Structural Analysis

    Reply
    Distinguished Contributor
    Posts: 121
    Registered: ‎08-03-2012

    Prolem Meshing SOLID AND SHELL

    229 Views, 7 Replies
    09-27-2012 07:58 AM

    Hi all.

    I built modol combine solid (representing SOIL) and foudation raft (SOLID) . When I calculation erro meshing.

    How to divide the right.

    File modol and Pass in PM. (RG_Adsk)

    http://www.mediafire.com/?18mpb48mkaicl88

     

    2012-09-27_2149.png

     

     

    Please use plain text.
    Valued Mentor
    tony.ridley
    Posts: 476
    Registered: ‎09-07-2011

    Re: Prolem Meshing SOLID AND SHELL

    09-27-2012 03:49 PM in reply to: A.wikipedia

    Why make it so complicated?

    Please use plain text.
    Distinguished Contributor
    Posts: 121
    Registered: ‎08-03-2012

    Re: Prolem Meshing SOLID AND SHELL

    09-27-2012 05:14 PM in reply to: tony.ridley

    Hi tony. Pass in PM.

    because I want to design all together.
    I was do with Sap V2000 very good, but very time consuming.
    I'm starting with Robot, help me save time in the solid building blocks.

     

    Please use plain text.
    Distinguished Contributor
    bjur
    Posts: 110
    Registered: ‎09-14-2011

    Re: Prolem Meshing SOLID AND SHELL

    09-27-2012 05:41 PM in reply to: A.wikipedia

    I might be missing something but why not just assign soil springs to the slab?  In the slab properties you can assign soil properties to the slab. Make sure you set the uplift direction correctly (positive Z axis). You will also need to assign a horizontal restraint to the slab to keep it from sliding. 

    Please use plain text.
    Valued Mentor
    tony.ridley
    Posts: 476
    Registered: ‎09-07-2011

    Re: Prolem Meshing SOLID AND SHELL

    09-27-2012 05:46 PM in reply to: bjur

    Thats what I was trying to get at bjur...........

     

    Why not just have node supports with springs, or a slab on ground as you suggest. 

    The solid base is just too much work for no real advantage In my opinion. 

     

    Tony

    Please use plain text.
    Distinguished Contributor
    Posts: 121
    Registered: ‎08-03-2012

    Re: Prolem Meshing SOLID AND SHELL

    09-27-2012 06:16 PM in reply to: tony.ridley

    Thanks.

    To bjur.

    Yes. I will assign a horizontal restraint to the slab to keep it from sliding.


    To tony.
    In modol, I do not Foundation raft, I want to do the Foundation pile raft, but I have not added the pile.
    If you can give me one example of modol pile raft??
    Thanks for the great comments.

     

    Please use plain text.
    Valued Mentor
    tony.ridley
    Posts: 476
    Registered: ‎09-07-2011

    Re: Prolem Meshing SOLID AND SHELL

    09-27-2012 06:28 PM in reply to: A.wikipedia

    Draw panel to represent pile cap and then piles under?

     

    Please use plain text.
    Product Support
    Posts: 2,514
    Registered: ‎04-26-2010
    Please use plain text.