• Industries
  • Products
  • Buy
  • Services & Support
  • Communities
  • Autodesk Robot Structural Analysis

    Reply
    Mentor
    stroxy
    Posts: 166
    Registered: ‎12-06-2011
    Accepted Solution

    Building Base Level

    162 Views, 3 Replies
    12-08-2011 09:09 PM

    Hi, when assigning stories, does the building base level correspond to the bottom of all substructure elements i.e. basements, piles, foundations etc. or does it correspond to ground level i.e. location of building base shear?

    Please use plain text.
    Product Support
    Posts: 2,532
    Registered: ‎04-26-2010

    Re: Building Base Level

    12-09-2011 12:20 AM in reply to: stroxy

    It is the lowest level from indicated by mouse or the level set by you manually

     

    groung.jpg



    Rafal Gaweda
    Product Support
    Autodesk, Inc.
    Please use plain text.
    Mentor
    stroxy
    Posts: 166
    Registered: ‎12-06-2011

    Re: Building Base Level

    12-09-2011 12:37 AM in reply to: RG_Adsk

    Still not quite clear.  In seismic design (building period determination), the height of the building is usually calculated as that above ground.  If I set my base level below ground, how will Robot calculate the building height

    Please use plain text.
    Product Support
    Posts: 2,532
    Registered: ‎04-26-2010

    Re: Building Base Level

    12-09-2011 12:46 AM in reply to: stroxy

    The approach you describe is kind of manual approach.

    Robot uses modal results (analytical) based on FEM model \ calculations where the defined supports are considered. Definition of ground level does not matter for these calculations .



    Rafal Gaweda
    Product Support
    Autodesk, Inc.
    Please use plain text.