    Phased by Phasing

    384 Views, 12 Replies
    02-03-2012 09:57 AM

    In the Revit MEP template file my company usesI have added a Project Phase called "Demolition".  In the Phasing "Graphic Overrides", I have assigned a thinner line width and a Hidden line style to the "Demolition' phase.

     

    What I'm not understanding is why objects are not taking on the line width and line style for the "Demolition" phase when I insert them into a view that has the "Demolition" phase assigned to it.  When I check the properties of these objects, the "Phase Created" field says "Demolition".  If I change this to "Existing", which is the phase before "Demolition" on the "Project Phases" tab, the objects take on the line width and style assigned to the "Existing" phase.

     

    If I change the phase of the view to "Existing" and insert objects into it, the same thing happens, they don't follow the Phasing "Graphic Overrides" for the "Existing" phase, they basically follow the line width and style designated for their "Catagory" in "Object Styles".

     

    It seems like if I have some graphic overrides in place for a phase and assign that phase to an object then that object should take on those graphic overrides.  Obviously there is something I'm missing.

     

    Can anyone shed some light on why this is not happening?  Thanks in advance for any responses.

     

     

    Please use plain text.
    *Expert Elite*
    Posts: 1,913
    Registered: ‎08-28-2009

    Re: Phased by Phasing

    02-03-2012 11:06 AM in reply to: frazzlesnazzle

    Don't create a specific phase for Demolition, unless you have specific reasons to do so. In a "standard" project, you will only need Existing and New Construction. The appearance of Demolished elements is determined by the element's Phase Demolished parameter (under its properties) and the Phase parameter of the View. When setting up initial views, I recommend creating three - Existing, Demolition, and New Construction, with the settings below.

     

    View              Phase                         Phase Filter                     Purpose

    Existing           Existing                        Show Complete                 Place ALL existing elements here.

    Demo              New Construction        Show Previous + Demo    Set the desired existing elements to Demolished.

    New               New Construction        Show Previous + New      Place ALL new elements here.

     

    Demolition is not a Phase, it is an Action within a Phase (to quote a Jrobker). If an element is marked to be demolished in the New Construction Phase, then it will appear as you intended in the Demo View. Just ask if you need more information.

    Corey D.                                                                                                                                                               LogoEE.png   AutoCAD user  Revit user
    ───────────────────────────────────────────────────────────────────────────────────────────
    ⁞|⁞ Please use the Mark Solutions!.Accept as Solution and Give Kudos!Give Kudos functions as appropriate to further enhance the value of these forums. Thank you! ───────────────────────────────────────────────────────────────────────────────────────────
    Please use plain text.
    Valued Contributor
    Posts: 64
    Registered: ‎08-05-2009

    Re: Phased by Phasing

    02-03-2012 12:00 PM in reply to: CADastrophe

    Ahhh, I was just looking at it the wrong way.  "Demolition is not a Phase, it is an Action within a Phase."  That sentence makes all the difference.

     

    Thanks CADastrophe (and Jrobker).

    Please use plain text.
    Distinguished Mentor
    asommer
    Posts: 752
    Registered: ‎08-10-2009

    Re: Phased by Phasing

    08-02-2012 07:46 AM in reply to: frazzlesnazzle

    I have a similar problem...

     

    I have an architectural model that has 2 phases... Existing and New Construction.  The Architect set Demolished objects to be demolished in New Construction.  I need to show my existing to remain as light lines in New Construction, and I got that to work, but I see the Architect's Demo stuff!  Can you help?

    Please use plain text.
    *Expert Elite*
    Posts: 1,913
    Registered: ‎08-28-2009

    Re: Phased by Phasing

    08-02-2012 07:53 AM in reply to: asommer

    Is this intended to be a demolition or a new work plan? You said that you see the architect's demo, but are you seeing your demo work as well?

    Corey D.                                                                                                                                                               LogoEE.png   AutoCAD user  Revit user
    ───────────────────────────────────────────────────────────────────────────────────────────
    ⁞|⁞ Please use the Mark Solutions!.Accept as Solution and Give Kudos!Give Kudos functions as appropriate to further enhance the value of these forums. Thank you! ───────────────────────────────────────────────────────────────────────────────────────────
    Please use plain text.
    Distinguished Mentor
    asommer
    Posts: 752
    Registered: ‎08-10-2009

    Re: Phased by Phasing

    08-02-2012 08:07 AM in reply to: frazzlesnazzle

    My Renovation Phase.  I don't see my demo (correct), but I do see the Arch's demo (Incorrect).  I do have Existing, Demolition, and New Construction.  They only have Existing and New Construction.

    Please use plain text.
    *Expert Elite*
    Posts: 1,913
    Registered: ‎08-28-2009

    Re: Phased by Phasing

    08-02-2012 08:18 AM in reply to: asommer

    You have a "Demolition" Phase? Is there a specific reason that you need that phase? Normally, one should only need the Existing and New Construction phases.

    Corey D.                                                                                                                                                               LogoEE.png   AutoCAD user  Revit user
    ───────────────────────────────────────────────────────────────────────────────────────────
    ⁞|⁞ Please use the Mark Solutions!.Accept as Solution and Give Kudos!Give Kudos functions as appropriate to further enhance the value of these forums. Thank you! ───────────────────────────────────────────────────────────────────────────────────────────
    Please use plain text.
    Valued Contributor
    AnmarieJames8335
    Posts: 79
    Registered: ‎06-09-2010

    Re: Phased by Phasing

    08-02-2012 09:26 AM in reply to: frazzlesnazzle

    asomer,

     

    So, your Renovation Plan is intended to show just existing and new, correct? Why not just use the New phase?

     

    Regardless of that, I'm wondering what the graphics overrides are in the New phase of the architectural model itself.

     

    AJ

    Please use plain text.
    *Expert Elite*
    Posts: 1,913
    Registered: ‎08-28-2009

    Re: Phased by Phasing

    08-02-2012 09:33 AM in reply to: AnmarieJames8335

    I was thinking that perhaps the Phase Mapping should be set to: Demolition Phase = arch's Existing Phase.

                                                                           -or-

    Maybe he has to override the Phase Setting for the Link under Visibility/Graphics Overrides.

    Corey D.                                                                                                                                                               LogoEE.png   AutoCAD user  Revit user
    ───────────────────────────────────────────────────────────────────────────────────────────
    ⁞|⁞ Please use the Mark Solutions!.Accept as Solution and Give Kudos!Give Kudos functions as appropriate to further enhance the value of these forums. Thank you! ───────────────────────────────────────────────────────────────────────────────────────────
    Please use plain text.
    Distinguished Mentor
    asommer
    Posts: 752
    Registered: ‎08-10-2009

    Re: Phased by Phasing

    08-02-2012 09:49 AM in reply to: frazzlesnazzle

    If I just have existing and new, existing shows same as new, even with the different filters.  Links display phases differently.  If I get my existing pipes to show grey on new construction, then I also see the Architect's DEMO, since thier demo is on the new construction phase.

     

    I have a demo phase so we can keep track of it.  our engineers change thier mind a lot, so I need to "Keep" the demo'd objects just in case.