    door schedule - keying in details

    248 Views, 1 Replies
    01-29-2013 10:36 AM

    I've added the fields in my door schedule for head, jamb and sill details.  These field appear be manually completed.  Is there a way to link the field to the actual detail?  

     

    That way, for example if the detail were to be moved to another sheet, the field in the door schedule would be automatically updated.

    Please use plain text.
    Contributor
    Posts: 22
    Registered: ‎06-06-2012

    Re: door schedule - keying in details

    01-31-2013 12:55 AM in reply to: wpiotraschke

    Unfortunately not.  This is still a manual process I am afraid. It isn't possible to reference other views within a schedule.

    Kevin Fielding
    BIM Coordinator
    AEW Architects
    Manchester, UK

    If my post solves your issue, please accept this as a solution and give me a thumbs up!