    Project Point and Survey Point

    220 Views, 1 Replies
    05-04-2011 10:01 AM

    Does Revit Arch. 2011 lockdown the position of either of these points in relationship to the model?  If I saveas to a project, as a central file,  does it lock down the position of either of these points?  If I export the model into Civil 3D 2010 the insertion point is the project point, not the survey point.  The survey point has been moved to the proper coordinates, and the model updated to the coordinate position via the specify coordinates at point command.  Has anyone experienced this behavior?

     

    Thanks

    Please use plain text.
    Employee
    Posts: 730
    Registered: ‎06-01-2010

    Re: Project Point and Survey Point

    05-06-2011 07:56 AM in reply to: civman_daar

    At any time in the project you can change the project base \ survey point.  It never really gets locked down, and you can change it through a variety of approaches such as publishing coordinates, relocating the project, specifying coordinates at a point, acquiring coordinates, or transferring project standards.  I have included some examples below:

     

    Publish Coordinates

     

    Acquire Coordinates

     

    Specify Coordinates at a Point

     

    Relocate Project

     

    Transfer Project Standards

     

    For the ADSK Civil3D workflow it functions somewhat differently where the Survey Point coordinates are utilized.  I would reference the thread below on this issue, which included tutorials on the necessary workflow:

     

    Project Point and Revit Internal Coordinate system

     

    Thank you,



    Ryan Duell
    Autodesk, Inc.

    Revit Clinic
    @revitclinic