I've been getting frsutrated as I try to 'lock' a beam system that I have used for rafters to the underside of my roof.
I've successfully got the walls and gables linked in with the roof, and have set up reference planes for cutting of rafters (that should - I think - mean that rafters can move slightly - or change pitch, whilst maintaining same cut extents at rafter ends).
Trouble is - the rafter Beam System does not update with the roof.
My creation approach for the Beam System was to select the underside of the roof as the 'Working Plane' - then edit the boundary to project beyond the walls and form the overhang. I projected it further than I required to provide the excess needed in case I wanted to push the cut plane outwards.
I assumed that selecting the underside of the roof as the working plane would 'lock' the two together, but it doesn't appear to work.
I've attached the before and after shots of changing the roof pitch below.
Have I missed a straightforward step to link the two elements together ?
Thanks
Martin
Solved! Go to Solution.