    Default Coordinate System

    510 Views, 5 Replies
    09-01-2012 09:05 PM

    I had heard from someone that when using AIM 2013 that you shouldn't change the default coordinate system. I suppose it makes sense as to why you wouldn't need to change it but what issues can crop up if you do change it? Or did I hear wrong?

    Please use plain text.
    *Expert Elite*
    TRogers
    Posts: 630
    Registered: ‎09-05-2007

    Re: Default Coordinate System

    09-02-2012 07:30 AM in reply to: BrianHailey

    Autodesk actually told us to use the default coordinate system at the Tech Academy this year.  But, I have been quite successful in assigning the coordinate system right from the start.  I alway do and I will be showing it on AU Virtual as setting a State Plane coordinate system from the start of a the project.

    If the issue was resolved by this method, please click on "Accept As Solution"
    *Civil 3DJ*
    Todd Rogers

    Visit my blog here.

         
    Please use plain text.
    Employee
    konstantin.baumann
    Posts: 84
    Registered: ‎01-04-2011

    Re: Default Coordinate System

    09-03-2012 01:47 AM in reply to: TRogers

    Tood is right: if all your source datasets are already given in a single consistent and specific CS, you can use that CS as the model CS as well and avoid some internal reprojections of your data during data import.

     

    What you also can do is: leave the model CS at it's default value (LL84; WGS84) and just set the "user CS" (UCS) to the CS you would like to display the coordinates in the status bar at the lower left. You can change the "user CS" (UCS) in the model properties (AIM 2013: left click on the program icon at the top left; select "Model settings..."; change the "UCS" entry).

    Please use plain text.
    Employee
    Posts: 19
    Registered: ‎07-31-2012

    Re: Default Coordinate System

    09-03-2012 01:53 AM in reply to: BrianHailey

    Changing the Model CS during "New" and using a projected coordinate system will not increase speed or accuracy, or make it possible to import more data, but it will limit the possible size of your model. The only reason to change the default settings is if you plan to work directly with the model's SQLite file outside Autodesk Infrastructure Modeler.

     

    The User CS is used to display coordinates in the status bar and for any other CS display. You can set that to any coordinate system at any time without affecting how data is stored in the GIS database or displayed in the 3D model.

    Heiko Meyerdirks
    Engineering Manager
    Autodesk IPG ICP InfraWorks
    Please use plain text.
    *Expert Elite*
    BrianHailey
    Posts: 2,390
    Registered: ‎04-27-2005

    Re: Default Coordinate System

    09-03-2012 10:08 AM in reply to: heiko.meyerdirks

    So, if all of my data is in the same coordinate system, I can assign that coordinate system to the model when I create it. After it's created, I can change the User Coordinate System to display the coordinates however I need.

     

    If I have a data in different coordinates it's best to use the default coordinate system at model creation and just change the User Coordinate System as needed.

     

    Does that sound right?

    Please use plain text.
    Employee
    Posts: 19
    Registered: ‎07-31-2012

    Re: Default Coordinate System

    09-04-2012 04:54 AM in reply to: BrianHailey

    That is right. Actually, you not even need to change the CS even when all your data is stored in one different CS. Projecting to LL always does work lossless for AIM.
    In many cases, you will also be successful re-projecting data in an individual CS in AIM. But this depends on the CS you selected and on the input data as many CS have just a specific area which is valid. So here, you will face unexpected behavior in some cases.

    You also cannot change the model CS afterwards, so once you run into such an problem, rebuilding the model may become necessary. Therefore we suggest not to change LL if you have no intend to work on the SQLite file directly or of cause policies. That way you will stay flexible for whatever data you will add in future.

     

    about the User CS, you are right.

    Heiko Meyerdirks
    Engineering Manager
    Autodesk IPG ICP InfraWorks