Message 1 of 6
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi,
Is there a methode to prioritize connector snaps prior to groundplane snaps when Sync from ACAD?
In my video attached, you can see assets that are placed on top of each other, fall back down on the floor after Sync from ACAD in stead of staying connected to the connectors.
Thanks
Solved! Go to Solution.