Autodesk Factory Design Suite
Reply
Topic Options
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic to the Top
- Bookmark
- Subscribe
- Printer Friendly Page
Linking equipment and work cells to ERP workcenter s and routings
Options
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Email to a Friend
- Report Inappropriate Content
87 Views, 0 Replies
02-27-2012 07:49 AM
Has any work been done to link a work cell or resource in Acad Factory Designer to ERP workcells. If the modeling is done in CAD, the information should be able to be synched with the ERP resource details.
If some one could provide me with a sample 3d layout I would be interested in working on a link to the Infor Syteline ERP workcenter and resource data..
Thanks
