Hi, I'm trying to understand what is mean of the different report results of "transportation" and "Machine".
I am trying to reproduce a concrete batch plant with 2D Layout factory.
I have a Sand BIN, a Cement Silo and a Concret Mixed.
To try I put the Mixer with a energy consumption 1kW.
Then at the Routings for the operation of mixer I put 60minutes.
There are two Mixer Jobs, then I think could be 120 minutes.
When I display the "Machine" report appears 250KWH.
I have tried every way, and cannot understand why happens this.
Any idea?
Attached the file.
Solved! Go to Solution.
Solved by XuesongBai. Go to Solution.
Hi,
Let me explain that:
Total Power Consumption (kW.h) = (setup time + processing time) * Part Quantity * Energy Consumption Rate at each operation for all jobs
(Unit of setup and process time should be converted to Hour.)
For Job arena:
Step time =0+0=0
Process Time=0+60min=60min=1hour
Total Power Consumption (kW.h)_arena=(0+1hour)*150*1KW=150KW.H
For Job cemento:
Step time =0+0=0
Process Time=0+60min=60min=1hour
Total Power Consumption (kW.h)_cemento=(0+1hour)*100*1KW=100KW.H
So Total Power Consumption for all jobs= 150+100=250KW.H
Thanks,
-Xuesong
Thanks Xuesong,
It is enough to solve my question.
Do you think that this equation may be explained at wikihelp?
Thanks