• Industries
  • Products
  • Buy
  • Services & Support
  • Communities
  • Autodesk FMDesktop

    Reply
    *melanie stone

    Re: About 3D in FM

    08-18-2006 12:21 PM in reply to: Allerian
    erm... :smileywink: no comment.

    --
    Melanie Perry

    "clintonG" wrote in message
    news:5273638@discussion.autodesk.com...
    The part about them not being very bright you mean? ;-)

    <%= Clinton

    "melanie stone" wrote in message
    news:5273518@discussion.autodesk.com...
    holy cow. that sounds just like my job now (except the WO system is fully
    functional and invaluable they've found since implementing it about 10 years
    ago).

    and I do agree with you that the concept of BIM is about integrating *data*
    into a model.

    --
    Melanie Perry
    ***not all who wander are lost***
    http://mistressofthedorkness.blogspot.com/

    "clintonG" wrote in message
    news:5273480@discussion.autodesk.com...

    Everything was then dumped into AutoCAD and I tried my best to make sense of
    the mess. I also inherited a so-called plan room which was an area in a
    machine and equipment room where dozens of drawing sets comprised of
    thousands of drawing sheets were tossed without any means of coordination. I
    cleaned that all up and tried my
    best to integrate with CAD and other means to manage these assets

    Regardless, I learned a lot on that job about the way hospitals were
    designed and constructed. Actually I learned in these contemporary times the
    business of healthcare causes a hospital to be "under construction" at all
    times. The mess was so bad it got to the point that I set up a meeting to
    discuss a proposal I had.

    To make a long story short I proposed we use the CAD drawings as base-plans
    from which security and work flow management systems could be developed and
    managed. I suggested the base-plans could for example assist security to do
    their job. Security should have an interactive set of drawings in their
    offices. A rapid reference and response system is what I proposed.

    I also pointed out that laborers from different contracting firms were
    wandering all over the place so I proposed creating a work order check
    in/check out system for contractors. Drawings from the work order system
    would also provide contactors with facility information regarding locations
    of medical gas, water supply lines, and so on.

    Less than an hour after everybody politely thanked me for a great idea that
    "they" in all their wisdom agreed was "not feasible" the alarms sounded --
    ONK ONK ONK ONK ONK ONK ONK -- everybody scrambled in fear. It was LOUD and
    scary. It was also poetic justice. A contractor had entered the wrong area
    of a room and cut through a water supply line flooding the entire neonatal
    intensive care unit which had to be evacuated of cribs and equipment. BTW,
    my as-builts did show the supply line. The contractor was never given
    documentation because as they used to say it was "all in the CAD."

    The 3D model is not simply based on a value proposition relevant to visual
    information. Even though visual information will be found useful (perhaps
    marginally so in certain applications) the era of BIM is here and the data
    that is possible to build into a 3D model is going to prove itself
    invaluable over time as more insight into its use is understood.

    At this point in time however those of us that understand these principles
    are trying to work with our peers and colleagues to help them with the
    "vision thing."
    Please use plain text.
    Employee
    Posts: 119
    Registered: ‎12-22-2004

    Re: About 3D in FM

    08-18-2006 01:38 PM in reply to: Allerian
    "the concept of BIM is about integrating *data* into a model" -- well said from both of you. It's the rich data about all of the equipment/assets/spaces that I want to move into FM.

    I think of it this way... The real value of BIM is the accurate data and the analysis enabled by the model (clash detection, energy analysis, HVAC design, etc). Building an accurate model for those analyses is best done with 3D tools. So 3D is a means, not the end. The same is true of passing it to FM.

    Mark Evans
    Autodesk


    Mark Evans
    Senior Product Manager
    AEC Division, Simulation Product Line
    Autodesk, Inc.

    Please use plain text.
    *Mikey52

    Re: About 3D in FM

    08-23-2006 10:39 PM in reply to: Allerian
    As a general contractor and building owner, I would like to offer my 2 cents
    on the value of 3d as it relates to facility management and construction.

    I do not use FM desktop, not even sure of it's capabilities. I do use
    accounting software, access and excel in manners customized for my needs.

    With a properly drawn model and ability to check interferences before
    construction, subcontractors can and should be held to higher standards.
    There can be fewer reasons for HVAC to be routed any way other than what the
    plans show. Plumbing and piping can be placed correctly without adding
    fittings or re-routing because a cable tray or duct is in the way.
    Electrical, fire systems, communications all in their proscribed locations,
    including height AFF.
    These things have all been reasons for change orders when using only 2d plan
    sets. A lot of contractors count on change orders for their profits, re: bid
    low to get the job and make it up on change orders that are nothing but
    profit.

    Once the BIM and full 3d interferece is implemented prior to and during
    during new construction, fewer change orders will be needed to complete the
    job. The finished product will then be much closer to the design drawings
    without a lot of as built revisions, which also add to the cost of
    construction.
    Sooo..... with 3d models we have hopefully reduced the errors and also the
    final cost of the building.

    As a building owner, in possesion of all this 3d information, I am more
    prepared for renovations as tennants come and go. KNOWING what and where
    things exist makes it much easier and less costly to make changes needed
    by/for the next tennant.

    As the owner and paying client, I will accept no less than a full and
    complete set of the 3d digital files from the Architect, to be used for
    future renovations, repairs or whatever needs to be done. All MEP and
    structurals also to be included in 3d format (ABS). Too much customization
    is required in Revit to do anything. And now you have to have 2 versions
    just to get it done, but that is a different rant for another venue.

    As far as architects claims to intellectual property, hogwash. I am paying
    for their time, their design and all files created using MY money. If they
    don't see it that way, then I will spend MY money with a different firm.
    They have made their profits, now I get to make a return off my investment.
    AIA only requires the architect to maintain his original files for 10 years.
    This new building will be around after he/she and I are dust in the ground,
    and a properly maintained digital set of files is or will be invaluable to
    future owners and managers of the structure.

    I personally have spent sevaral years of freetime learning ADT and ABS to be
    able to utilize these files in construction and management of buildings.
    I could expand on this much further, but, I think I have ranted enough for
    now.
    --
    Mikey52

    ABS/ADT 2007
    VisionRez
    Dell M90
    Intel T2600
    Nvidia Quadro 2500m
    4 Gig Ram
    wrote in message news:5273206@discussion.autodesk.com...
    To your point about the resources: Verifying a building in 3D vs. 2D is
    costly at best and rarely included in projects.

    I got my start working on HVAC design so I know where you're coming from in
    terms of determining volumes for load calculations, etc. That's a very
    different thing from having a database of accurate square footages driven by
    an accurate drawing (which is what FMD is all about). IMHO, a successful FM
    system shows its value by connecting financial accountability to
    space/assets and making groups responsible for thier needs.

    About the idea of "greatly reducing interferences", we just a had a local
    roundtable about this. The premise is that Contractor A might design
    something that collides with Contractor B's design and that AutoCAD
    magically finds and displays these interferences. While this might be a
    nice QC, I can't rationalize shifting any of this responsibility to the
    software. Back when we all used "regular" AutoCAD, you were required to be
    able to read all disciplines of drawings and read them well. I'll never
    forget the engineer who taught me a hard lesson by making me lay out
    ductwork in a building that had an unusual structural situation...

    -Robert
    FM Desktop User's Group
    http://www.fmdugi.org
    Please use plain text.
    *melanie stone

    Re: About 3D in FM

    08-24-2006 05:48 AM in reply to: Allerian
    Didn't sound like a rant to me at all and you certainly don't have to stop!

    Are you currently requiring 3d documents or is that something being
    implemented? If you it is in place, how long have you been doing it? How
    easy/hard was it to find companies who were using those programs? Are the
    drawing files of decent quality? How do you check the quality?

    Really, I'd be interested in hearing any other
    thoughts/procedures/roadblacks/needs for improvement, etc that you care to
    share...

    Thanks for sharing.

    --
    Melanie Perry
    ***not all who wander are lost***
    http://mistressofthedorkness.blogspot.com/

    "Mikey52" wrote in message
    news:5305509@discussion.autodesk.com...

    As the owner and paying client, I will accept no less than a full and
    complete set of the 3d digital files from the Architect, to be used for
    future renovations, repairs or whatever needs to be done. All MEP and
    structurals also to be included in 3d format (ABS). Too much customization
    is required in Revit to do anything. And now you have to have 2 versions
    just to get it done, but that is a different rant for another venue.

    As far as architects claims to intellectual property, hogwash. I am paying
    for their time, their design and all files created using MY money. If they
    don't see it that way, then I will spend MY money with a different firm.
    They have made their profits, now I get to make a return off my investment.
    AIA only requires the architect to maintain his original files for 10 years.
    This new building will be around after he/she and I are dust in the ground,
    and a properly maintained digital set of files is or will be invaluable to
    future owners and managers of the structure.

    I personally have spent sevaral years of freetime learning ADT and ABS to be
    able to utilize these files in construction and management of buildings.I
    could expand on this much further, but, I think I have ranted enough for
    now.
    --
    Mikey52

    ABS/ADT 2007
    VisionRez
    Dell M90
    Intel T2600
    Nvidia Quadro 2500m
    4 Gig Ram
    Please use plain text.
    Contributor
    Posts: 18
    Registered: ‎08-17-2006

    Re: About 3D in FM

    08-24-2006 05:49 AM in reply to: Allerian
    Hey, thanks for that reply Mikey52. Nothing compares to knowing your building and holding those who construct and improve it accountable.
    Please use plain text.
    *Mikey52

    Re: About 3D in FM

    08-25-2006 01:53 AM in reply to: Allerian
    Melanie,
    which by the way is a beautiful name, and my wife of 34 years, name also. I
    now know of two couples that fit the bill of "Mike and Melanie"

    I will begin with a little info about me, my background and my workflow, and
    then try to address your questions.
    I started my own construction business when I was 22, with a high school
    education, a few hours of college credits nd five years of driving nails. I
    had several years experience with pencil and paper, going all the way back
    to high school, before deciding to jump into the digital world of Cad, ADT
    and ABS. Mostly I worked out details of jobs, or parts of jobs, at night to
    make the work easier for my crew or subs to understand what the final
    product was to be. Some plan shops put out a lousy set of CD's for
    residential construction, and a lot if not most decisions had to be made in
    the field. Many times we would get 2d drawings that were impossible to build
    in the 3d world. I have carried more than one set of plans into the
    architects office and showed them why a particular design could not be
    built, and end up showing them what had to change in order to get close to
    their intended design. I finally decided I had had enough of designers and
    architects that had no clue about real world construction means and methods.
    I know it's not a requirement for registered achitects, but I think they
    should all have to actually _ork in the field with hammer and nails before
    they ever draw or design anything, but that is just another one of my rants.
    The same could be said for software designers of the tools (Cad) that are
    being used to produce the drawings. How can you draw or design something
    without first hand knowledge of real world lumber, bricks and mortar
    processes?

    The above issues are what led to my decision to begin drawing my own plans.
    In the residential field, an AIA stamp is not required for permitting. I
    still enjoy doing my own CD's for my residential clients, almost as much as
    looking at the final product and saying "This is a good job, and we should
    all be proud to have contributed to it's completion."

    I work a little different than most, since I am also the building
    contractor. By the time my plans are ready for permitting, I have already
    built the structure, at least in my head and in ADT. I am a hands on type of
    builder. Carry my laptop and a small printer with me to the job site. If
    there are any questions, some subcontractor needs a little more info, I can
    bring up my drawing, zoom in to the area and show them right there the 3d
    view that deals with the particular issue. I can even print the area in
    question right on the spot, which further clarifies most issues. I have used
    some of the same subs for many years. I know their capabilities and they
    know what I require from them. Loyalty, which works both ways, goes a long
    way in getting a job completed in a reasonable time and without having to do
    anything twice. I am a firm beliver in the old addage "If you don't have
    time to do a job right, when will you have time to do it over?"

    There are really only four considerations in making most business decisions:
    Price(speaks for itself), Service(good communications, availability, and
    response time), Quality( do it right the first time), and Speed (getting the
    work done by a stated deadline, too often without regard to quality and
    detail). You can pick any three of these things and still do a good job,
    depending on the situation, but you can never have all four at the same
    time. My choice has always been Service and Quality fist, with the toughest
    decision deciding on one of the other two. I try to avoid the jobs where
    timing is the only consideration, because you are then forced into using a
    more costly solution.

    Now to the present day and your questions.

    I have been working with a particular architect for several projects now. I
    built a couple of jobs that he had drawn and saw the extra effort he put
    forth on his plans. Went to his office and found he was using ADT and ABS to
    do his drawings. The detail is as good as any I have ever seen. When I
    decided to be an owner and not just a contractor, I went back to this
    architect. Part of the contract was for turning over a copy of the digital
    files when the design was complete and I wanted as much as possible in 3d.
    Since we had developed a working relationship, he reluctantly agreed. With
    a good superintendant and a lot of my time on the job, it turned out to be
    as smooth of a job as I had ever done. I held each sub to very tight
    standards and never let them shortcut or deviate from the well thought out
    plans. I had all of the subs quote the job as they normally would. Of course
    they added a little too much fudge factor to the price, in my opinion, so I
    sat down with the major ones and proposed a workable cost plus arrangement.
    I promised all of them a 10% profit as long as they would do a fair
    accounting of their time and materials. I outlined an order for the work to
    be completed in, based on past buiding history. Underground utilities and
    site work first, followed by concrete and structural, plumbing and piping,
    HVAC, fire control systems, electrical. interior partitions and drywall,
    cabinets and casework and finally the painting contractor. There would be no
    deviation from this workflow. No sub was allowed to begin work until the sub
    before him felt he was far enough along for the next sub to begin his work.
    I was always available with laptop and drawing files to work out details
    that were not perfectly clear on the 2d set of plans. Everything went like
    clockwork. No subcontractors fighting for workspace. Subs finishing their
    part of the job before the next sub began. Everyone was held to using only
    the space and routing laid out in the 3d drawing. We found on occasion that
    a look at the 3d pictures, the drawing files, answered any questions that
    arose in a much easier to comprehend manner than the 2d set could convey. It
    worked out great! Overall the costs were nearly 20% lower than the original
    bids, they were happy with not having to worry about losing money, and I was
    happy that the job was finished in a more than satisfactory timeframe. I
    turned around and gave them all a 10% bonus, which made them even more
    happy. The architect was impressed with the way his files were used to
    complete the job. No need for "as built sets of drawings" because it was
    built just like the drawings. I have been doing it this way ever since and
    the results have always been very similar. I would not go back to 2d hard
    copy only plans to do a project. It has worked well now for 3 years. I will
    always require the digital files when it is my money being paid to the
    architect.

    As for checking quality, it is like any other building set. I work almost
    like a consultant alongside and conjunction with my archie. I am just
    another plan checker, but I am able to look at the digital files at the same
    time and know what I am looking at and for. He knows I am very capable of
    using the software almost as well as he.

    I also believe as the software improves, this method of construction will
    only get better. Having the digital files will make any renovations over the
    years much easier to design and impliment, which is at least part of what I
    would call FM. I would always keep the original plans as a failsafe and use
    a copy to show any renovations.

    The biggest fear in all of this would be a major change in file formats
    without backward compatibility. It might be prudent to create an updated
    archive with each major release, always keeping the previous versions safely
    stored. Digital storage space is cheap and getting cheaper all the time. 2d
    sets could be reprinted, or pdf's created for easy viewing, at any time down
    the road as the need arises.

    I could go on about this much longer but I fear I have already been a little
    windy. I think though, that getting old allows this?
    Finally, concerning Revit. It may be the tool of the future, but it ain't
    there yet. Why did they split revit into two incompatible programs for
    building and structure? From the files I have been able to peruse, I have
    not seen the level of 3d detail that ABS/ADT is capable of producing. I do
    not need pretty visualizations to build a buiding, I need accurate details
    in a drawing file.

    --
    Mikey52

    ADT 2007
    VisionRez
    Dell M90
    Intel T2600
    Nvidia Quadro 2500m
    2 Gig Ram
    "melanie stone" wrote in message
    news:5305785@discussion.autodesk.com...
    Didn't sound like a rant to me at all and you certainly don't have to stop!

    Are you currently requiring 3d documents or is that something being
    implemented? If you it is in place, how long have you been doing it? How
    easy/hard was it to find companies who were using those programs? Are the
    drawing files of decent quality? How do you check the quality?

    Really, I'd be interested in hearing any other
    thoughts/procedures/roadblacks/needs for improvement, etc that you care to
    share...

    Thanks for sharing.

    --
    Melanie Perry
    ***not all who wander are lost***
    http://mistressofthedorkness.blogspot.com/

    "Mikey52" wrote in message
    news:5305509@discussion.autodesk.com...

    As the owner and paying client, I will accept no less than a full and
    complete set of the 3d digital files from the Architect, to be used for
    future renovations, repairs or whatever needs to be done. All MEP and
    structurals also to be included in 3d format (ABS). Too much customization
    is required in Revit to do anything. And now you have to have 2 versions
    just to get it done, but that is a different rant for another venue.

    As far as architects claims to intellectual property, hogwash. I am paying
    for their time, their design and all files created using MY money. If they
    don't see it that way, then I will spend MY money with a different firm.
    They have made their profits, now I get to make a return off my investment.
    AIA only requires the architect to maintain his original files for 10 years.
    This new building will be around after he/she and I are dust in the ground,
    and a properly maintained digital set of files is or will be invaluable to
    future owners and managers of the structure.

    I personally have spent sevaral years of freetime learning ADT and ABS to be
    able to utilize these files in construction and management of buildings.I
    could expand on this much further, but, I think I have ranted enough for
    now.
    --
    Mikey52

    ABS/ADT 2007
    VisionRez
    Dell M90
    Intel T2600
    Nvidia Quadro 2500m
    4 Gig Ram
    Please use plain text.
    *melanie stone

    Re: About 3D in FM

    08-25-2006 06:56 AM in reply to: Allerian
    Alright, that gives me a much better idea of where you're coming from and
    how you got there. Thank you!

    First, your wife... lovely! I don't know all that many people that share my
    name. Too cool.

    Right... I agree with you that people that haven't worked out in the field
    are viewing things entirely different than those who are doing the building.
    I love the idea that the orginal plans *are* the as-builts.

    I give props to you for holding everyone accountable. I definitely see that
    as the biggest problem I face in new construction / renovations at my
    facility. I suppose that goes back to the thing of having someone doing the
    checking who knows and understands what's being done.

    lol... don't fear being too 'windy', the background really helped me
    understand a lot, and I thank you for taking the time out to answer my
    questions. It's much appreciated.

    Revit? Make that three programs, yeah? I'll be getting Building Systems to
    learn soon (comes in a package with ABS at this point)...
    This ties into discussions over in the Revit Building and Revit Systems
    forums about just having a single package, or having a base package with
    modules for Structure and Systems as an option.

    I can't speak with much authority on the benefits of ADT vs Revit, as I've
    not used either one of them in-depth nor in a production environment.
    They're still both way above my head...

    I'll admit to being bitter about ADT as many of my contractors *halfway* use
    it, but, many of them don't, and we don't use it inhouse. They just can't
    understand why I want/need the aecobjects removed/flattened, etc. no matter
    how many times I tell them.

    The big problem then is that, we're not all on the same program, so there
    are things that each of us can and can't do. So... I'd like to have a model
    of my buildings, but, if we're only 10% there, we'll not do it at all.

    Am I wrong in my all or none mentality? ~shrug~ Doesn't matter, because we
    can't afford to buy everyone seats of autocad so they can get the object
    enablers, etc. rambling... sorry. :smileywink:

    --
    Melanie Perry
    ***not all who wander are lost***
    http://mistressofthedorkness.blogspot.com/

    "Mikey52" wrote in message
    news:5307209@discussion.autodesk.com...
    Melanie,
    which by the way is a beautiful name, and my wife of 34 years, name also. I
    now know of two couples that fit the bill of "Mike and Melanie"

    I will begin with a little info about me, my background and my workflow, and
    then try to address your questions.
    I started my own construction business when I was 22, with a high school
    education, a few hours of college credits nd five years of driving nails. I
    had several years experience with pencil and paper, going all the way back
    to high school, before deciding to jump into the digital world of Cad, ADT
    and ABS. Mostly I worked out details of jobs, or parts of jobs, at night to
    make the work easier for my crew or subs to understand what the final
    product was to be. Some plan shops put out a lousy set of CD's for
    residential construction, and a lot if not most decisions had to be made in
    the field. Many times we would get 2d drawings that were impossible to build
    in the 3d world. I have carried more than one set of plans into the
    architects office and showed them why a particular design could not be
    built, and end up showing them what had to change in order to get close to
    their intended design. I finally decided I had had enough of designers and
    architects that had no clue about real world construction means and methods.
    I know it's not a requirement for registered achitects, but I think they
    should all have to actually _ork in the field with hammer and nails before
    they ever draw or design anything, but that is just another one of my rants.
    The same could be said for software designers of the tools (Cad) that are
    being used to produce the drawings. How can you draw or design something
    without first hand knowledge of real world lumber, bricks and mortar
    processes?

    The above issues are what led to my decision to begin drawing my own plans.
    In the residential field, an AIA stamp is not required for permitting. I
    still enjoy doing my own CD's for my residential clients, almost as much as
    looking at the final product and saying "This is a good job, and we should
    all be proud to have contributed to it's completion."

    I work a little different than most, since I am also the building
    contractor. By the time my plans are ready for permitting, I have already
    built the structure, at least in my head and in ADT. I am a hands on type of
    builder. Carry my laptop and a small printer with me to the job site. If
    there are any questions, some subcontractor needs a little more info, I can
    bring up my drawing, zoom in to the area and show them right there the 3d
    view that deals with the particular issue. I can even print the area in
    question right on the spot, which further clarifies most issues. I have used
    some of the same subs for many years. I know their capabilities and they
    know what I require from them. Loyalty, which works both ways, goes a long
    way in getting a job completed in a reasonable time and without having to do
    anything twice. I am a firm beliver in the old addage "If you don't have
    time to do a job right, when will you have time to do it over?"

    There are really only four considerations in making most business decisions:
    Price(speaks for itself), Service(good communications, availability, and
    response time), Quality( do it right the first time), and Speed (getting the
    work done by a stated deadline, too often without regard to quality and
    detail). You can pick any three of these things and still do a good job,
    depending on the situation, but you can never have all four at the same
    time. My choice has always been Service and Quality fist, with the toughest
    decision deciding on one of the other two. I try to avoid the jobs where
    timing is the only consideration, because you are then forced into using a
    more costly solution.

    Now to the present day and your questions.

    I have been working with a particular architect for several projects now. I
    built a couple of jobs that he had drawn and saw the extra effort he put
    forth on his plans. Went to his office and found he was using ADT and ABS to
    do his drawings. The detail is as good as any I have ever seen. When I
    decided to be an owner and not just a contractor, I went back to this
    architect. Part of the contract was for turning over a copy of the digital
    files when the design was complete and I wanted as much as possible in 3d.
    Since we had developed a working relationship, he reluctantly agreed. With
    a good superintendant and a lot of my time on the job, it turned out to be
    as smooth of a job as I had ever done. I held each sub to very tight
    standards and never let them shortcut or deviate from the well thought out
    plans. I had all of the subs quote the job as they normally would. Of course
    they added a little too much fudge factor to the price, in my opinion, so I
    sat down with the major ones and proposed a workable cost plus arrangement.
    I promised all of them a 10% profit as long as they would do a fair
    accounting of their time and materials. I outlined an order for the work to
    be completed in, based on past buiding history. Underground utilities and
    site work first, followed by concrete and structural, plumbing and piping,
    HVAC, fire control systems, electrical. interior partitions and drywall,
    cabinets and casework and finally the painting contractor. There would be no
    deviation from this workflow. No sub was allowed to begin work until the sub
    before him felt he was far enough along for the next sub to begin his work.
    I was always available with laptop and drawing files to work out details
    that were not perfectly clear on the 2d set of plans. Everything went like
    clockwork. No subcontractors fighting for workspace. Subs finishing their
    part of the job before the next sub began. Everyone was held to using only
    the space and routing laid out in the 3d drawing. We found on occasion that
    a look at the 3d pictures, the drawing files, answered any questions that
    arose in a much easier to comprehend manner than the 2d set could convey. It
    worked out great! Overall the costs were nearly 20% lower than the original
    bids, they were happy with not having to worry about losing money, and I was
    happy that the job was finished in a more than satisfactory timeframe. I
    turned around and gave them all a 10% bonus, which made them even more
    happy. The architect was impressed with the way his files were used to
    complete the job. No need for "as built sets of drawings" because it was
    built just like the drawings. I have been doing it this way ever since and
    the results have always been very similar. I would not go back to 2d hard
    copy only plans to do a project. It has worked well now for 3 years. I will
    always require the digital files when it is my money being paid to the
    architect.

    As for checking quality, it is like any other building set. I work almost
    like a consultant alongside and conjunction with my archie. I am just
    another plan checker, but I am able to look at the digital files at the same
    time and know what I am looking at and for. He knows I am very capable of
    using the software almost as well as he.

    I also believe as the software improves, this method of construction will
    only get better. Having the digital files will make any renovations over the
    years much easier to design and impliment, which is at least part of what I
    would call FM. I would always keep the original plans as a failsafe and use
    a copy to show any renovations.

    The biggest fear in all of this would be a major change in file formats
    without backward compatibility. It might be prudent to create an updated
    archive with each major release, always keeping the previous versions safely
    stored. Digital storage space is cheap and getting cheaper all the time. 2d
    sets could be reprinted, or pdf's created for easy viewing, at any time down
    the road as the need arises.

    I could go on about this much longer but I fear I have already been a little
    windy. I think though, that getting old allows this?
    Finally, concerning Revit. It may be the tool of the future, but it ain't
    there yet. Why did they split revit into two incompatible programs for
    building and structure? From the files I have been able to peruse, I have
    not seen the level of 3d detail that ABS/ADT is capable of producing. I do
    not need pretty visualizations to build a buiding, I need accurate details
    in a drawing file.

    --
    Mikey52

    ADT 2007
    VisionRez
    Dell M90
    Intel T2600
    Nvidia Quadro 2500m
    2 Gig Ram
    "melanie stone" wrote in message
    news:5305785@discussion.autodesk.com...
    Didn't sound like a rant to me at all and you certainly don't have to stop!

    Are you currently requiring 3d documents or is that something being
    implemented? If you it is in place, how long have you been doing it? How
    easy/hard was it to find companies who were using those programs? Are the
    drawing files of decent quality? How do you check the quality?

    Really, I'd be interested in hearing any other
    thoughts/procedures/roadblacks/needs for improvement, etc that you care to
    share...

    Thanks for sharing.

    --
    Melanie Perry
    ***not all who wander are lost***
    http://mistressofthedorkness.blogspot.com/

    "Mikey52" wrote in message
    news:5305509@discussion.autodesk.com...

    As the owner and paying client, I will accept no less than a full and
    complete set of the 3d digital files from the Architect, to be used for
    future renovations, repairs or whatever needs to be done. All MEP and
    structurals also to be included in 3d format (ABS). Too much customization
    is required in Revit to do anything. And now you have to have 2 versions
    just to get it done, but that is a different rant for another venue.

    As far as architects claims to intellectual property, hogwash. I am paying
    for their time, their design and all files created using MY money. If they
    don't see it that way, then I will spend MY money with a different firm.
    They have made their profits, now I get to make a return off my investment.
    AIA only requires the architect to maintain his original files for 10 years.
    This new building will be around after he/she and I are dust in the ground,
    and a properly maintained digital set of files is or will be invaluable to
    future owners and managers of the structure.

    I personally have spent sevaral years of freetime learning ADT and ABS to be
    able to utilize these files in construction and management of buildings.I
    could expand on this much further, but, I think I have ranted enough for
    now.
    --
    Mikey52

    ABS/ADT 2007
    VisionRez
    Dell M90
    Intel T2600
    Nvidia Quadro 2500m
    4 Gig Ram
    Please use plain text.
    Contributor
    Posts: 24
    Registered: ‎02-06-2007

    Re: About 3D in FM

    02-07-2007 07:49 AM in reply to: Allerian
    Isee this discussion as follows:

    Want precise and inteligent information about your property, and you have the money to pay for 3d documents, and your architexts are 3D powerd? Go 3D!

    Want precise area information about your property, and you do not have the money to pay for 3d documents, and your architexts are not 3D powered? Go 2D!

    Want precise and inteligent information about your property, and you do have the money to pay for 3d documents, and your architects are not 3D powerd. Go 2D or change architect.


    Use 3D for to work with complex and non stopping maintenaces task to improve your maintenace operations and acurancy.

    Use 2D if you deal with normal facility issues and the mechanical systems are not too complex.

    Another factor is your cultural background. There are countries where the 2D or 3D will never make a diference because if the job can be done with 2D, why bother with 3D?
    I've seen this with CAD Management. If the final product is a set of sheets, Why do we bother to set CAD Standards? We will built the same thing. And believe me, that has hapened to me very often here in my island, Puerto Rico. Some cultures see the value in things that goes beyond the expected, others just are not that impresed at all. It is a huge change resistance. Some people prefer to be uin a comfort area where they master what they know, and for them, that is better than learning a new thing to master.

    Bttom Line 3D or 2D is about money, your daily practice, and how much resistance you put to changes.
    Please use plain text.
    *Wanderer

    Re: About 3D in FM

    02-07-2007 08:07 AM in reply to: Allerian
    3d isn't really an option here yet...

    I've got 6million square feet on my campus dating back 100 years (and
    consult with our facilities because their cad guys are... quasi-cad guys
    if they have any at all).

    Not to mention the politics of dictating a switch or dropping a
    contractor who has been working on this campus for 30 years. ~shudder~
    Politics are the bane of our existence here.

    BUT, I don't think we're exactly talking about an entire switch to 3D
    here. I'm thinking 'facility in 3d' I'm thinking Revit and Revit
    Structure and Revit Systems and Civil 3D (or ADT, ABS and LDT, if
    properly utilitzed). There's no flippin way.

    BUT, if we're talking about zoning areas with 3D architectural spaces
    that can be automatically generated with a handful of input from the end
    user... Well, I think it's doable and I'll be trying it if I get the
    go-ahead on my pilot here.

    Unfortunately, if the pilot succeeds (on approx. 5% of the campus) that
    will mean planning and trying to allocate resources to do the other
    95%... then probably rolling it out to the rest of the Facilities in the
    Health Care System. I can't even begin to estimate how many square feet
    ( :smileywink: or cubic feet) all of our other buildings are or the current
    state of their document resources.

    josrios wrote:
    > Isee this discussion as follows:
    >
    > Want precise and inteligent information about your property, and you have the money to pay for 3d documents, and your architexts are 3D powerd? Go 3D!
    >
    > Want precise area information about your property, and you do not have the money to pay for 3d documents, and your architexts are not 3D powered? Go 2D!
    >
    > Want precise and inteligent information about your property, and you do have the money to pay for 3d documents, and your architects are not 3D powerd. Go 2D or change architect.
    >
    >
    > Use 3D for to work with complex and non stopping maintenaces task to improve your maintenace operations and acurancy.
    >
    > Use 2D if you deal with normal facility issues and the mechanical systems are not too complex.
    >
    > Another factor is your cultural background. There are countries where the 2D or 3D will never make a diference because if the job can be done with 2D, why bother with 3D?
    > I've seen this with CAD Management. If the final product is a set of sheets, Why do we bother to set CAD Standards? We will built the same thing. And believe me, that has hapened to me very often here in my island, Puerto Rico. Some cultures see the value in things that goes beyond the expected, others just are not that impresed at all. It is a huge change resistance. Some people prefer to be uin a comfort area where they master what they know, and for them, that is better than learning a new thing to master.
    >
    > Bttom Line 3D or 2D is about money, your daily practice, and how much resistance you put to changes.
    Please use plain text.
    Contributor
    Posts: 19
    Registered: ‎01-30-2007

    Re: About 3D in FM

    02-07-2007 06:51 PM in reply to: Allerian
    Sounds like an interesting pilot...

    You pose an interesting question here. How many CAFM systems can manage drawings and data from AutoCAD, ADT, and Revit in a uniform environment? OK, OK, so it's a leading question...FMDesktop is the only CAFM system I know that can do this. So as the facility management world slowly enters the 3D world, FMDesktop will be there to guide them through the transition.

    It's up to us, the facility managers, to make our needs known and help steer the future of FMDesktop.
    Please use plain text.