    Method to get a cost estimate using BOM.

    409 Views, 5 Replies
    08-01-2012 08:39 AM

    Hi all,

    I have a question about estimating the real life cost of construction of a Project designed in Autocad. (I use Autocad Plant 3D)

     

    What I want to know is what method should I use. I searched the forums and didn't find a clear answer on what is the best method.

     

    Here is what I think would work, but before actually making it, I want to know, from experienced users, what works and what doesn't.

     

    Option 1- Assign a price tag to every piece of equipment / Produce a BOM / use a formula in the BOM to get the total price.

     

    Option 2- Assign a price tag to every piece of equipment / Produce a BOM / Export to excel and create the formula to get the total price.

     

    Option 3- Produce a BOM / Use Excel to assign a price to every piece of equipment using unique IDs in a price list and calculate the total price.
     

    Which one is better ? Maybe the best option would be something else completely ?

     

    There is not an easy answer I guess!

     

    Thanks!

     

     

     

     

     

    Please use plain text.
    *Expert Elite*
    dgorsman
    Posts: 3,396
    Registered: ‎10-12-2006

    Re: Method to get a cost estimate using BOM.

    08-01-2012 09:03 AM in reply to: MAD1975

    First, try the Plant 3D forum - they will have much better idea of estimating in your field than those here.

    Second, try project management sites - this one is primarily for technical support, and most of the posters here are technically (rather than manager -ially) oriented.

    ----------------------------------
    If you are going to fly by the seat of your pants, expect friction burns.
    Adopt. Adapt. Overcome. Or be overcome.


    Please use plain text.
    Active Member
    MAD1975
    Posts: 6
    Registered: ‎10-05-2011

    Re: Method to get a cost estimate using BOM.

    08-02-2012 05:37 AM in reply to: MAD1975

    Thanks to the admin for moving the post.

     

    Please use plain text.
    Employee
    KenFauver
    Posts: 20
    Registered: ‎10-31-2011

    Re: Method to get a cost estimate using BOM.

    08-02-2012 09:05 PM in reply to: MAD1975

    Hi Mad,

     

    My option is a variation of your Option #1. I would add the price field to the catalog and Calculate the Total cost by generating a report in Report Writer. The report writer allows you to use expressions similar to excel. 

    Please use plain text.
    Contributor
    Proccie
    Posts: 14
    Registered: ‎09-02-2011

    Re: Method to get a cost estimate using BOM.

    08-03-2012 04:07 AM in reply to: MAD1975

    I would say option 3 is your best bet.

    Reason being is to tally up pipe lengths is easier done in Excel. (With pivot tables and such)

    Also with a price change, it would mean re-doing your catalogues and specs, updating models, etc etc...

     

    My opinion anyways...

     

    Good luck!

    Please use plain text.
    Active Member
    MAD1975
    Posts: 6
    Registered: ‎10-05-2011

    Re: Method to get a cost estimate using BOM.

    08-03-2012 01:08 PM in reply to: MAD1975

    Thanks for those who answered. Choice #3 seems to be the way to go since I have many pipes in my design. But this will have to wait...

     

    Please keep the thread alive as I am experiencing a frustrating FATAL ERROR : Unhandled Access Violation Reading 0x0000 Exception at f50cd74eh... for whatever this means!

     

    Will be back as soon as I get this fixed.

     