    Bill Of Materials

    244 Views, 2 Replies
    08-20-2012 06:54 AM

    I just received instruction to run a BOM (Bill Of Materials) on an entire piping job.  Meaning, we want to extract a BOM that accounts for every line number we have in that job folder.  Is that possible to do?

    Please use plain text.
    *Expert Elite*
    dave.wolfe
    Posts: 474
    Registered: ‎12-04-2009

    Re: Bill Of Materials

    08-20-2012 08:47 AM in reply to: jeremylegleu

    Yes, you'll need to group your items according to the line number.  Use the report creator.  At the bottom of the page referred to in the link below there is a short section on grouping. Basically, you'll switch out the Short description field with the Line number tag field.

     

    http://www.pdoteam.com/2012/07/creating-a-bill-of-material-row-number-in-plant-3d-reports/

    Dave Wolfe
    Isaiah 57:15

    ECAD, Inc.
    Tips and Tricks on our blog: Process Design, from the Outside

    A P3D Authorized Reseller
    Please use plain text.
    Contributor
    Posts: 14
    Registered: ‎04-02-2012

    Re: Bill Of Materials

    08-20-2012 10:00 AM in reply to: dave.wolfe

    Got it, thanks for your help!